Tourly Flashcards
The following on the rig shall be checked tourly: “Tourly Tourly FLAWS”
Tiller buzzer (SB 10), Tiller wheels aligned (SB 10), Fill fuel tank, Lights (non-response: we can only change headlights), Air tanks purged (particularly important in sub-freezing weather), Warning devices (need 1 audible device & lights to remain I/S), & Seat belts
Hoods shall be inspected _ for tears, discoloration, stretching, or open seams
Start of each tour
At the start of each tour the PSS shall be inspected by depressing the cam & pulling _” or rope through the EXO to ensure device functions properly. Pull the rope back through the EXO leaving _” between EXO & Anchor hook
3-6”;
8”
Inspect Pak Tracker _
Tourly
OOD shall supervise checking of water level in all steam boilers _
Immediately after roll call
OOD shall supervise checking of water level in all steam boilers _
Water column in boiler must be kept at a height of _ of glass gauge for safe operation of boiler
After roll call 0900 and 1800
3/4 full
Part One of PCR, the original, is to be forwarded to the Office of Medical Affairs, through the bag, by the end of each
Tour
FAST Pak must be inspected
Before each tour and after each use
Inspect Thermal Imaging Camera
Immediately after 0900 & 1800 Roll call & After each use
Ultra Rad shall be turned on _;
Clear Dose on Ultra Rad _
Whenever out of qtrs (emergency & non-emergency operations).
Clear tourly. Turn off in qtrs.