Steam dumps Flashcards

1
Q

Effect of losing ANY unit specific 125VDC bus:

A

Steam dumps will not open due to loss of power to at least one control solenoid.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Effect of loss of offsite power:

A

Loss of off site power, steam dumps will not open due to C-9.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If ‘A’ RTB fails to open on reactor trip:

A

Steam dumps control on Plant trip controller @557F if armed by load rejection (10% in 2 minutes).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If ‘B’ RTB fails to open on reactor trip:

A

Controls on load rejection controller @560F (3F error)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When does each steam dump open based on demand signal?

A

0-25% A, E, J
25-50% B, F, K
50-75% C, G, L
75-100% D, H, M

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

C-7 Loss of load setpoint, coincidence and function

A

10% decrease w/i 120 seconds on 2/3 coincidence (PT505, 506 and EH Pimp).
Arms steam dumps in Tave mode after load rejection.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

C-9 Condenser available setpoint, coincidence and function

A

Condenser pressure >23” vacuum and CW brkr closed.
Condenser available for steam dumps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

P-12 Low-Low Tave setpoint, coincidence and function

A

<550F, 2/4, Blocks steam dumps. If 3/4 Tave exceeded 550F, the bypass interlock must be reactivated when 2/4 Tave lower to <550F.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What happens when the A-train reactor trip breaker auxiliary contacts open?

A

Arms steam dumps in Tave mode after plant trip.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The input to the ‘A’ solenoid is ___ and it receives power from DC bus ____.

A

P-12 ‘A’ Train
DC 113

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The input to the ‘B’ solenoid is ___ and it receives power from DC bus ____.

A

P-12 ‘B’ train
DC114

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The input to the ‘C’ solenoid is ___ and it receives power from DC bus ____.

A

Tave/Tref/no load Tave
DC113

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The input to the ‘D’ solenoid is ___ and it receives power from DC bus ____.

A

‘Steam press’ position
Load rejection C-7
A-train RTB/BYB open
-and- C-9
DC113

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

There are _____ bypass interlock trn switch(es). The function of the off/reset position is____, the function of the on position is_____, and the function of the bypass position is_____.

A

2, train A and B
Off/reset blocks air to steam dump by de-energizing the A and B solenoids; also resets Lo-2 Tavg interlock being bypassed.
On- Steam dumps operate normally.
Bypass- Permits operation <550F using the 3 cooldown dumps, spring return to ‘on’.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Purposes of steam dump system: (5)

A
  1. Provide an artificial steam load
  2. Remove 40% load without actuation of SG safeties after a reactor trip, and bring plant to equilibrium.
  3. Control steam pressure at no-load conditions.
  4. Used when transient exceeds rod control design of >10% step change.
  5. Provide manual cooldown of plant.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Function of A and B solenoids:

A

Prevents excessive cooldown
De-energizes to block air from passing; block auto clear >550F

17
Q

Function of C solenoid:
Normally ____ to pass air to D solenoid.
______ positioner on large error signals.
When_____ full IA changes stroke to ____ seconds.
Hi-1 bypasses groups ______
Hi-2 bypasses groups_______

A

Normally de-energized to pass air to D solenoid.
Bypasses positioner on large error signals.
When bypassed, full IA changes stroke to 3 seconds.
Hi-1 bypasses groups 1 and 2
Hi-2 bypasses groups 3 and 4

18
Q

Function of D solenoid:

A

Normally de-energized; energizes to ARM passing air to B solenoid.

19
Q

If the mode select switch is in STM PRESS, compares ____ to _____.

A

Validated 2nd highest steam pressure to desired steam pressure.

20
Q

Steam dump armed light will be caused by: (3 items)

A

C-9 -and any of the following-

‘Steam press’ position
Load rejection C-7
A-train RTB/BYB open

21
Q

Group 1 ____
Group 2 _____
Group 3 _____
Group 4 _____

A

1-A, E, J
2-B, F, K
3-C, G, L
4-D, H, M

22
Q

Steam dump valves are ___ to open and ____ to close.

A

Air
Spring

23
Q

_____Hi fast opens group __and ___ valves when on the load reject controller.

A

8.2F(7.4F) Hi fast opens group 1 and 2 valves

24
Q

_____ HiHi Fast opens group _ and _ valves when on the load reject controller.

A

13.4F(11.8F) HiHi Fast opens group 3 and 4 valves

25
Q

_____Hi fast opens group __and ___ valves when on the plant trip controller.

A

15F
groups 1 and 2 valves

26
Q

_____HiHi fast opens group __and ___ valves when on the plant trip controller.

A

30F
Groups 3 and 4

27
Q

Load reject controller controls at ____ above Tave and the plant trip controller controls at _____above Tave.

A

3F
0F

28
Q

The steam dump actuated light means that ______ and the steam dump armed light means that_____.

A

Any of the trip open temperature bistables has reached or exceeded its setpoint.

One of the arming circuits has armed the steam dumps.

29
Q

The reset position of the mode select switch _______.

A

Resets the C-7

30
Q

Normally steam dumps have a ___ second stroke time and will fast open in ____ seconds.

A

20
3

31
Q

Group __ valves are the cooldown valves and can cool the RCS to <_____.

A

1 (A, E, J)
<550F

32
Q

Load reject controller range from 0-100% demand is ____ and plant trip controller range from 0-100% demand is ______.
Load reject helpful hint:
Hint add 5.2 for hi 5.2 more for hi hi
Add4.4 for hi and 4.4 more for hi hi

A

10.4F (8.8F) (Accounts for the 3F at 0%)

30F

33
Q

PK-507 (steam pressure controller) normally set at ______ and output is ___% demand for each ___ psi error.

A

1092#
1% demand for each 1 psi error

34
Q

When is the Load Reject controller in service?

A

Steam Dumps in Tave Mode w/RTB or BYB closed

35
Q

If a single Bypass/Interlock switch is placed in OFF, how many steam dump valves will NOT be able to open?

A

12 (No valves can open)

36
Q

Loss of Instrument Bus 111:

A

Steam Dumps will not arm on a Load Reject (C-7)