Control room ventilation Flashcards
Starting interlocks
Supply____
Return____
Makeup___
Supply None
Return Supply fan running
Makeup 1. Supply fan running
2. Deluge valves not open
Auto starts
Supply _____
Return _____
Makeup ____
Supply None
Return None
Makeup 1. SI 2. Hi rad (Red1/2) PR031/32A, 33/34-0B. RM operate failure 2/2 or Loss of 1/2 power supplies
Trips
Supply ______
Return ______
Makeup _____
Supply 1. Fan Hi DP, 15 sec TD, 2. Deluge open, 3. Overcurrent
Return 1. Supply fan off, 2. Overcurrent
Makeup 1. Supply fan off, 2. Lo air flow (45 sec TD), 3. Deluge valve not closed, 4. Overcurrent
High radiation signal, one of the following is required to actuate:
1.
2.
3.
- High gaseous radiation on the control room outside air intake. Either 0PR31J or 32J train A/ 0PR33J or 34J train B.
- Operate failure on both 31 and 32J or 33 and 34J.
- Loss of power to one rad monitor
A LOOP to ______ will result in the operating VC train restarting in ____.
141/142
Emergency M/U mode
SI sequence
- MU filter fan starts
- MU filter fan outlet damper modulates open to control flow.
- MU filter unit intake damper opens
- Normal intake from outside closes
- Recirc charcoal adsorber unisolates.
- Both control room WO pps and chillers receive starts signals. U1 only
Stby train chiller only starts if cw pump running. - Isolates purge dampers if open.
SI to CR ventilation must be manually reset with _____ located_____.
by ESF reset PBs on PM06J to realign system.
High radiation signal must be clear to realign dampers to normal postion. This is accomplished by ____.
No reset PBs, high radiation signal must be clear
MU air bypass line used for ___, ____, or _____ in turbine building.
Fire, High rad, or HELB
A single VC Temperature Control System train will
provide the required temperature control to maintain the
control room _______.
<=90F
The design basis of the VC Temperature Control System is to
maintain the control room temperature for _____ of
continuous occupancy.
30 days
What is the normal air supply for the makeup fan?
Turbine building
What happens if CR purge in progress and a SI occurs?
Purge is terminated