Containment Spray Flashcards
CS add tank empty alarm:
Empty alarm and 125VDC status lights at 11.0%
To close CS019s spray add to eductor valve:
Reset CS signal
Manually close CS019s
Formula for keeping iodine in solution
I2 + 2OH- =>I- + IO- +H2O
Operation design basis:
System designed to deliver:
- Between 30-36% by weight NaOH solution to form a 8.0-10.5 pH solution when combined with RCS leakage and all RWST water. pH control minimizes effect of chloride and caustic stress corrosion.
- System will satisfy design requirements with one eductor and both CS pumps operable.
Safety design basis:
- Reduce pressure in containment atmosphere at a rate to prevent exceeding design leak rate.
- Removed sufficient iodine from containment atmosphere to limit site and offsite boundary doses below CFR requirements.
- Components (except test/recirculating lines) are safety Cat 1 and quality group B.
- Components protected from missiles that could be generated by a LOCA.
- Ring header and risers are designed for Safe Shutdown earthquake.
The Hi-3 bistables for CS are ______to actuate to prevent inadvertent CS actuation on a _______to the bistable. These are _______by taking the bistable to _______. If one is bypassed, coincidence changes from ____ to _____.
Energized Loss of power Bypassed Test 2/4 2/3
Swap CS pump suctions from ______ to _______ at RWST level of _____. Secure pumps if RWST is ______.
RWST to Containment sump
12%
9% and still the suction source
pH control minimizes the effect of _____ and ______ corrosion.
Chloride and caustic stress corrosion
Design flow of A CS pump is ______ and B CS pump is _____with containment pressure of ______.
3415 GPM
3925 GPM
50 psig
CS010A/B is the ______ and auto opens on a _______. This valve fails _____on loss of IA.
Eductor isolation valve; CSAS signal
Fails open on loss of IA
CS019A/B are the _____ and auto open on ______. These are _____ operated valves. Flow rate from the spray add tank is approximately ______.
Spray add tank isolations
CSAS
Motor
55-60 GPM
CS007A and B are the _______ and auto open on ______.
Containment spray isolations going to containment
CSAS signal
If either CS007A/B or CS019A/B are not open within _______ of ________, an alarm will sound in the _____.
30 seconds
CSAS
MCR
Initiation of CS signal, what happens? 4 items
- CS007A/B opens
- CS019A/B open
- CS pumps start only when the CS019A/B valves are open
- CS010A/B gets a confirmatory open signal
CS actuation signals:
- Cntmt Hi-3 pressure (>20# 2/4)
2. Manual (2/2 @ 1/2 locations)