Secondary water system Flashcards
1
Q
Basis for minimum CST level:
A
Maintain the RCS at hot standby conditions for 2 hours followed by a cooldown to RHR conditions at 50F/hr followed by a period not longer than one-hour to allow warmup of the RHR pumps prior to placing the RHR system into service in shutdown cooling mode.
2
Q
A MCB alarm will occur if either the ____ or the _____ are not fully closed.
A
Emergency overflow or emergency makeup valves are not fully closed
3
Q
Emergency makeup to hotwell ___
Normal makeup to hotwell____
Normal overflow to CST____
Emergency overflow to CST____
A
7”
14”
21”
32”