Gaseous radwaste Flashcards
____provides cover gas for HUTs and ____ provides a backup at _____#.
One gas decay tank
Nitrogen
0.7#
____ and ____ are the major isotopes of concern in the event of a single GDT rupture.
Kr-85 and Xe-133
What provides cooling for the waste gas compressor seal water?
CC
Separator tank discharge AOV auto opens when pressure builds to _____.
60#
What automatic function is controlled by 0PR02J?
GWRCV014 gas release valve trips shut
What interlocks are required to cause the 0GW014 light to be lit?
Rad level <setpoint
Valve CS in open
Valve positioner>0% demand
What will cause an auto swap of in service GDT?
GDT pressure of 95#
Where are gaseous releases directed?
AB exhaust plenum
Design basis
- full power with 1% fuel failure
- Hold for 45 day decay time
- Tank rupture releasing isotopes of concern
The concentration of oxygen in the WASTE GAS HOLDUP SYSTEM
shall be _____by volume whenever the hydrogen concentration
is _____ by volume.
<=2% by volume
whenever hydrogen concentration is
>4% by volume
The quantity of radioactive material, excluding tritium and
dissolved or entrained noble gases, shall be limited to the
following:
a. Primary Water Storage Tank_____
b. Outside Temporary Tank _____
PWST ≤ 2000 Curies
Outside temporary tank ≤ 10 Curies
Gas decay tank is protected by a ______ relief valve?
150#
The limit for curie content storage of a gas decay tank is ______ and that prevents dose rates from exceeding ____ on a release at site boundary.
50000 Curies
0.5rem gamma
Which flowpaths vent to the cover gas header?
U1 and 2 PRT and RCDT
SRST
Gas analyzer