AR/PR Flashcards
0PR01J release tank monitor
Isolates tank discharge to CW blowdown, 0WX353 or 0WX896
0PR02J Gas decay tank
Isolates gas tank from vent system (GW014)
0PR05J Turb building fire and oil sump
Trips all sump pumps and closes 0OD030
1/2/0PR09J CC HX outlet
Closes the surge tank vent on its respective unit. Common monitor closes vents on both units.
0PR016-019J Blowdown afterfilter
Isolates flow to the CST (WX119) and opense (0WX058) to B/D monitor tanks
0PR026J Radwaste area vent
Trips supply and exhaust fans
1/2PR008J SG blowdown
Isolates sample flow PS179A-D to secondary sampling system only
0PR031-34J Control room vent
Closes outside intake and opens turb building intake. Starts M/U fan and places charcoal absorber online and closes bypass. Trips VV fans
0PR040J VR area vent
Bypass fan trips, charcoal filter fan starts and flow is directed through filter
0PR041J CP sumps
Trips sump pumps, shuts down regen and sluicing operation in the condensate polishers
0AR055/056J SFP area
FHB incident, places charcoal filter online, closes bypass dampers, opens inlet and outlet dampers and starts booster fan
1/2AR011/12J CVI
All VQ purge dampers close
0AR039J FHB crane
Prevents upward motion of FHB crane (Hoist will still move down and side to side)
What 3 process radiation monitors are safety related?
0PR031-34J MCR outside air intake
0PR035-038J MCR TB air intake
1/2PR030J WR gas monitors VA exhaust
What 4 area rad monitors are safety related?
0AR055/056 FHB incident
1/2AR011/12 Cont fuel handling incident
1/2AR020/21 Cont Hi range area monitor
1/2AR022/23A/B/C/D Steam line rad monitors