Fuel handling Flashcards

1
Q
A

Burnable poison rod assembly removal tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
A

Thimble plug handling tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
A

Irradiated sample handling tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
A

New fuel handling tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
A

Spent fuel assembly handling tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
A

Control rod drive shaft unlatching tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the 3 pneumatically operated tools?

A
  1. Portable RCCA change tool
  2. Control rod drive unlatching tool
  3. RCCA change fixture
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How does the transfer cart emergency pullout cable work?

A

If the transfer cart drive system fails during refueling and cannot be repaired, an emergency pull out cable is used. The cart is pulled into the fuel handling building using the aux hoist on the spent fuel pit bridge crane.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

FHB crane has ____and ____ interlocks that prevent dropping a heavy load over SFP. ____ must be bypassed to reach new fuel elevator.

A

Mechanical and electrical

Electrical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Slow zone speed is _____ fpm.

A

7 fpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Core alteration definition

A

CORE ALTERATION shall be the movement of any fuel,
sources, or reactivity control components, within
the reactor vessel with the vessel head removed
and fuel in the vessel. Suspension of CORE
ALTERATIONS shall not preclude completion of
movement of a component to a safe position.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Recently irradiated fuel definition

A

Fuel that has occupied part of a critical reactor
core within the previous 48 hours. Note that all
fuel that has been in a critical reactor core is
referred to as irradiated fuel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If one FHB vent system inop, restore in _____. If not completed, _____ and verify it can be powered from _____.

A

7 days
Start operable train in emergency mode and verify it can be powered from an operable EDG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Fuel handling ventilation non compliance with tech specs suspends movement of _____ fuel.
Other fuel handling tech specs require suspension of movement of _____ fuel.

A

RECENTLY IRRADIATED

ALL/Irradiated fuel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

____ SR Flux monitors must be operable in mode ____ and must include _____ indication.

A

2
mode 6
Visual indication

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A required RHR loop can be removed from service for _____ hour per ____ hour period provided ______.

A

<=1 hour PER
8 hour period
No boron dilution operations

17
Q

_____level _____ loops of RHR operable and in operation.

A

> =23’
one loop operable and in operation

18
Q

_____level _____ loops of RHR operable and in operation.

A

<23’
Two loops RHR operable and one in operation

19
Q

When is the following applicable? Direct communications shall be maintained between the
control room and personnel at the containment refueling
station

A

During core alterations, suspend core alts if not met.

20
Q

4 Fuel handling bridge crane interlocks

A
  1. Electrical interlock prevents travel over SFP
  2. Mechanical interlock prevents travel over SFP
  3. Outward motion stops on hi rad of 100 mr/hr
  4. Overtravel stop on hoist and trolley
21
Q

3 new fuel elevator interlocks

A
  1. outward motion stops at 1200#
  2. Inward motion stops at 365# (Slack cable)
  3. Lower limit switch stop
22
Q

3 fuel transfer cart interlocks
all bypassable

A
  1. Transfer valve open prior to movement
  2. Both upenders down prior to movement
  3. Cart at travel stop prior to upender movement
23
Q

How many fuel assemblies can be stored in SFP?

A

2984

24
Q

How many fuel assemblies can be held in new fuel storage?

A

132 fuel assemblies

25
Q

Which radiation monitor will stop outward motion of the FHB (big overhead)crane?

A

AR039J