Fuel handling Flashcards
Burnable poison rod assembly removal tool
Thimble plug handling tool
Irradiated sample handling tool
New fuel handling tool
Spent fuel assembly handling tool
Control rod drive shaft unlatching tool
What are the 3 pneumatically operated tools?
- Portable RCCA change tool
- Control rod drive unlatching tool
- RCCA change fixture
How does the transfer cart emergency pullout cable work?
If the transfer cart drive system fails during refueling and cannot be repaired, an emergency pull out cable is used. The cart is pulled into the fuel handling building using the aux hoist on the spent fuel pit bridge crane.
FHB crane has ____and ____ interlocks that prevent dropping a heavy load over SFP. ____ must be bypassed to reach new fuel elevator.
Mechanical and electrical
Electrical
Slow zone speed is _____ fpm.
7 fpm
Core alteration definition
CORE ALTERATION shall be the movement of any fuel,
sources, or reactivity control components, within
the reactor vessel with the vessel head removed
and fuel in the vessel. Suspension of CORE
ALTERATIONS shall not preclude completion of
movement of a component to a safe position.
Recently irradiated fuel definition
Fuel that has occupied part of a critical reactor
core within the previous 48 hours. Note that all
fuel that has been in a critical reactor core is
referred to as irradiated fuel.
If one FHB vent system inop, restore in _____. If not completed, _____ and verify it can be powered from _____.
7 days
Start operable train in emergency mode and verify it can be powered from an operable EDG
Fuel handling ventilation non compliance with tech specs suspends movement of _____ fuel.
Other fuel handling tech specs require suspension of movement of _____ fuel.
RECENTLY IRRADIATED
ALL/Irradiated fuel
____ SR Flux monitors must be operable in mode ____ and must include _____ indication.
2
mode 6
Visual indication
A required RHR loop can be removed from service for _____ hour per ____ hour period provided ______.
<=1 hour PER
8 hour period
No boron dilution operations
_____level _____ loops of RHR operable and in operation.
> =23’
one loop operable and in operation
_____level _____ loops of RHR operable and in operation.
<23’
Two loops RHR operable and one in operation
When is the following applicable? Direct communications shall be maintained between the
control room and personnel at the containment refueling
station
During core alterations, suspend core alts if not met.
4 Fuel handling bridge crane interlocks
- Electrical interlock prevents travel over SFP
- Mechanical interlock prevents travel over SFP
- Outward motion stops on hi rad of 100 mr/hr
- Overtravel stop on hoist and trolley
3 new fuel elevator interlocks
- outward motion stops at 1200#
- Inward motion stops at 365# (Slack cable)
- Lower limit switch stop
3 fuel transfer cart interlocks
all bypassable
- Transfer valve open prior to movement
- Both upenders down prior to movement
- Cart at travel stop prior to upender movement
How many fuel assemblies can be stored in SFP?
2984
How many fuel assemblies can be held in new fuel storage?
132 fuel assemblies
Which radiation monitor will stop outward motion of the FHB (big overhead)crane?
AR039J