SOG 3-24 Structure Fire Flashcards
-SOG 3-24 Structure Fire-
Structure Fire- three basic tactical priorities
- Life safety
- Stabilize the incident
- prevention of further loss and preservation of property
SOG 3-24 Structure Fire-
Structure Fire- benchmarks for completion (3)
- all clear
- under control
- Loss stopped
SOG 3-24 Structure Fire-
Structure Fire- while responding personnel expected to arrive first should
begin theirs size up
SOG 3-24 Structure Fire-
Structure Fire- when arriving captains must remain cognizant of
-placement of apparatus on the fire scene leave room when possible for aerials, ambulances or other needs
SOG 3-24 Structure Fire-
Structure Fire- First arriving apparatus shall (5)
- provide an initial report of the scene to fire control and incoming apparatus
- Perform an initial size up and gather info
- Begin to develop the IAP
- assign duties to apparatus personnel
- relay any other pertinent info to Fire control and incoming apparatus
SOG 3-24 Structure Fire-
Structure Fire- initial report shall include (8)
LOSTCAFE
- that the apparatus is “on the scene”
=the location of the response, particularly if different than dispatched - type of structure - residential, commercial, industrial
-size of structure, height, floors
-building construction if known
-designation of alpha side
a brief report of initial fire/smoke conditions
-that captain is establishing command
SOG 3-24 Structure Fire-
Structure Fire- designation of command shall be a name unique to (3)
- street name
- business name
- apparatus designation
SOG 3-24 Structure Fire-
Structure Fire- conduct a 360 of the building with TIC in order to (4)`
- better formulate an incident action plan
- locate hazards
- attempt to assess floors above and below the fire
- attempt to determine if the fire involves the structure
SOG 3-24 Structure Fire-
Structure Fire- gather information questions include(4)
- is everyone out of the structure
- where is the fire
- what is burning
- how do you get there
SOG 3-24 Structure Fire-
Structure Fire- if everyone is not out ask (4)
- how many still inside
- how old are they
- where do you think they are
- where were they last seen
-SOG 3-24 Structure Fire-
Structure Fire- pertinent information shall be relayed to fire control and incoming apparatus may include (7)
TOOLRaIN
- operating mode of initial personnel (offensive or defensive
- Tactics being deployed
- status of the occupants
- location of the fire
- request for additional resources (ambulance, police utilitise) or apparatus
- change response to non emergency of additional apparatus
- other information as required
SOG 3-24 Structure Fire-
Structure Fire- First alarm responsibilities may include (17)
- initial report
- size up and info gathering
- develop IAP
- assign sectors as required
- protect onscene personnel and civilians by isolation and evacuating the scene as required
- initiate fire attack
- initiate primary search and rescue
- establish a tactical plan for ventilation
- establish a water supply
- establish incident safety officer
- establish entry control
- setup a RIT at the required level
- provide exposure protection
- review and preplan of structure where available
- relay the arrival of other services to fire control
- relay pertinent info
- any other duty assignment as directed by the IC
SOG 3-24 Structure Fire-
Structure Fire- all personnel entering the hot zone shall wear PPE including (6)
- bunker coat
- bunker pants
- helmet
- gloves
- boots
- SCBA
SOG 3-24 Structure Fire-
Structure Fire- when making entry into hot zone shall notify
IC, the first arriving officer shall notify Fire Control when mobile
SOG 3-24 Structure Fire-
Structure Fire- all interior teams should be equipped with (3+1)
- portable radios
- a thermal imaging camera
- hand lights
- consideration given to forcible entry tools