SOG 3-12 Rapid Intervention Team Flashcards
-SOG 3-12 Rapid Intervention Team-
A department apparatus with fully qualified RIT shall
Be automatically dispatched to any known structure fire call
-SOG 3-12 Rapid Intervention Team-
RIT shall be established as soon as possible
When personnel are working in the hot zone or IC seems necessary
-SOG 3-12 Rapid Intervention Team-
RIT may not be required
Where structure fire being fought strictly defensively. Where fire fought offensively and is under control the IC shall use discretion as to terminate RIT
-SOG 3-12 Rapid Intervention Team-
RIT is not required for every crew making entry into hazard but
More then one RIT may be required if resources are available depending on size and geographical layout
-SOG 3-12 Rapid Intervention Team-
RIT will have a minimum of least
3 members of firefighting division that have passed a BFES RIT course
-SOG 3-12 Rapid Intervention Team-
RIT shall be implemented
As part of the incident command system and accountability
-SOG 3-12 Rapid Intervention Team-
The IC should avoid
Assigning additional duties to an established RIT
-SOG 3-12 Rapid Intervention Team-
Level 1 RIT
Upon arriving RIT captain will announce onscreen with a message similar to
“S203 on-scene RIT”
Considerations must be given to the placement of apparatus not to interfere
-SOG 3-12 Rapid Intervention Team-
Level 1 actions may include (7)
Gathering info Completing RIT worksheet Staging equipment Discussions with IC and accountability officer Familiarizing them selves with layout Performing a 360 Locating secondary means of egress
-SOG 3-12 Rapid Intervention Team-
RIT at high rise staging area may be
Inside the building in a forward staging area
-SOG 3-12 Rapid Intervention Team-
Level 1 RIT may include the following equipment (10)
Full ppe RIT kit Scbas Tag line Flashlights Thermal imaging camera Forcible entry tools Cutters Straps Ladders
-SOG 3-12 Rapid Intervention Team-
Crews involved with fire operations must take note of RIT staging
So as not remove any equipment staged for use of the RIT
-SOG 3-12 Rapid Intervention Team-
Level 2 RIT implanted when (3)
Scene escalates
A 2nd alarm called
When requested by IC
-SOG 3-12 Rapid Intervention Team-
Level 2 RIT actions may include (4+)
Continuation of gathering info
Securing a power supply
Preparing lighting
Ensuring multiple means of egress (laddering windows, roofs, removing obstacles- bars, chains, locks)
-SOG 3-12 Rapid Intervention Team-
RIT must be cognizant the opening, windows or roofs may adversely effect ventilation operations. The RIT will
Consult IC and any crews performing ventilation operations prior to making rescue openings