SOG 3-19 Sector Work Cycles Flashcards
-SOG 3-19 Sector Work Cycles-
At escalating or prolonged incidents, the IC should
establish sector work cycles by assigning personnel to On Deck locations`
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- guild lines for IC (6)`
- Assign personnel to On deck as required
- Direct personnel to gather and stage equip
- Brief the assigned ON Deck of sector operations
- setup the work/rest cycle rotation and manage enough time for exiting hot zone with air
- manage personnel so there are always personnel ready full air
- build rehab into work cycle
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- assemble personnel with PPE SCBA and __________
one additional air cyclinder per firefighter
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- when staging on deck. Bring addition equipment as required including (3)
-thermal imaging camera, spare RIT, and tools
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- on deck assignment guildlines (6)
- acknowledge the On-Deck assignment with the IC
- notify the IC once they have arrived On-Deck
- Determine location of personnel working in the hot zone
- assess building arrangement and conditions
- ensure the rotation plan is understood
- relieve personnel in the hot zone when order by IC
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- if equipped in the event of a mayday
the on deck crew may be used as a RIT`
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- on deck shall operate only in the _______
warm zone, if your on air you are not On Deck
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles, on deck my perform warm zone functions such as (3)
- Perimeter control
- Gathering equipment
- RIT
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles - work cycles can be controlled by IC or sector officer if
if the sector officer is operating in the Warm zone, when the sector officer is working in the hot zone IC shall manage work cycles
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- sector officers shall notify the IC
when personnel require rehab outside the warm zone
-SOG 3-19 Sector Work Cycles-
Sector Work Cycles- for continuous water flow,
hot zone personnel shall be relieved at the nozzle