Pzr Relief Tank Flashcards
1
Q
Inputs to PRT
A
Pzr PORV’s & Saftey’s
ECCS relief valves
Misc valves stem leakoff
2
Q
Describe PRT
A
1800 ft3, carbon steel, 100 psig-full vacuum tank
Drains to RCDT
Has integral valve stem leak detection panel used to locate valves with excessive stem leakage ( red when temp > 212 deg)
3
Q
Auto interlocks for PRT
Gas analyzer valves (8034A & B)
Primary water supply (8029)
N2 supply valves (8045 , 8035)
Vent hdr Press Control vlv ( PCV-472)
A
Auto close on phase A
Phase A
Phase A / maintains 2.5-3.5 psig
Closes at 10 psig PRT Press
4
Q
All process streams into PRT?
A
- RCS from relief/safety/leakoff
- primary water to cool/ fill PRT
- nitrogen for cover gas
5
Q
Precautions and limitations for PRT
A
- don’t align gaseous radwaste system to PRT until both purged go O2