Liquid Rad Waste Flashcards

1
Q

What happens to LRW during discharge if RE18 goes into alarm?

A

RCV-18 closes, securing ovbd discharge

FCV-477 opens, recirculating flow back to EDR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are functions of LRW?

A
  • receive radioactive liquid waste
  • move batches of waste tank -> tank
  • process waste to reduce activity
  • discharge processed waste
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Describe LRW isolation signal

How do you reopen valves ?

A
  • Closes all LRW CIV’s
  • actuated by Phase A or manual (VB-2)
  • train A(inside cnmt), train B(outside cnmt)

-Reset phase A(if actuated), reset LRW isolation, open valves from control panel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What fluid normally fills PWR?

A

Processed water prior to discharge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Inputs to RCDT

A
  • system drains(RCS, cvcs, SI, RHR, accum)
  • seal table
  • Rx vessel flange leakoff
  • PRT
  • lower cavity drain
  • RCP seal leakoff #2 & 3
How well did you know this?
1
Not at all
2
3
4
5
Perfectly