Electric Power Xfr Flashcards

1
Q

What does “bus auto xfr to S/U power cutout switch” do? Why have this feature? What busses posses this feature?

A

Blocks auto xfr from AUX -> S/U Controlled restoration from loss of power Degraded 230 kV system => disable one or more xfr’s All busses that have auto xfr capabilities 12 kV D, E 4 kV D, E, F, G, H

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the “bus auto xfr reset” push button do? What condition(s) must be met for the button to work? What busses does this button exist for?

A

Auto xfr relays reset and associated control functions cleared (also resets local reset device) The initiating condition must be cleared All busses with auto xfr capability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What relays will “4 kV vital bus auto xfr trip relay reset device” reset? Can you manually take switch to Trip if it is in reset?

A
  • Xfr to S/U
  • Xfr to DG
  • Sequencial loading
  • Load shed

No, its like lockout relay, could break equip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are initiating events for an auto xfr to S/U for 4 kV system?

Include any differences between vital and non-vital

A
  • Unit Trip (86G1 or G11)
  • Both output bkrs open with:
    • Generator UV relay OR
    • MOD open
  • Aux feeder bkr Trip
  • **SI
  • **4 kV bus UV

** vital bus only signals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are initiating events for an auto xfr to S/U for 12 kV system? (12 kv bus auto xft -> s/u relay)

A
  • Unit Trip (86G1 or G11)
  • Both output bkrs open with
    • Generator UV relay OR
    • MOD open
  • Aux feeder bkr Trip
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What will block auto xfr to S/U?

12 kV

4 kV non vital

4 kV vital

A
  • Aux feeder breaker tripped on O.C.
  • Bus differential
  • No voltage sensed on S/U feeder breaker
  • *DG breaker closed
  • *xfr to DG initiated
  • *S/U feeder breaker tripped on O.C…..?

* only on vital 4 kV

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Describe actions for 12 kV auto xfr, include difference between fast and slow.

A
  • synch check between aux and s/u (if good => fast, if not => slow)
  • Trip aux bkr
  • Trip CWP (if not cut out)
  • close S/U bkr

* bus voltage decays < 25% before S/U bkr closes on slow transfer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is purpose for 12 kv bus UV relay (transfer trip relay)?

What actuates relay?

A

shed the RCP’s and CWP’s in event of:

  • xfr -> s/u signal with 0 S/U power and/or
  • UV condition on bus

actuation signals:

  • 0 s/u volts and
  • xfr -> s/u switch cut in (try to xfr) and
    • Unit trip or
    • aux bkr open or
    • PCB’s open with MOD open or Gen UV
  • inst UV and
  • time delay UV and
  • UV relay cut-in (local)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Describe purpose and actuation for 4 kv non vital bus UV relay

Describe purpose and actuation for 4 kv vital bus UV relay

A

Sheds loads on 4 kv bus on UV condition (CBP sets, #2HDP, Nash vac)

  • requires 2/2 UV (inst and 4 sec)

sheds loads on 4 kv vital

sends xfr to DG relay

sends signal to close DG output (aft 2 sec time delay)

  • 2/2 FLUR (inst and time delay, ~ 70% for 4 sec) OR
  • 2/2 SLUR (inst with time delay, ~91% for 20 sec)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Describe actions for 4 kv auto xfr to s/u, include difference between vital and non-vital.

A

aux feeder bkr opens

after either:

  • bus voltage decays ~ 25% OR
  • 4 seconds

S/U feeder bkr closes

* on vital bus sequencing timers start selected loads on bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly