What condition is the HSDP designed to
“maintain”
and
“acheive”
What controls for the Pzr PORVs are available at the HSPD?
maintain - hot standby
achieve - cold shutdown w/in 72 hours
emergency close - in case fire in CR or cable spreading room
How do you transfer control of a 4kv pump to HSDP?
Does anything happen to pump auto features when control is transfered to HSDP?
What happens when auto/manual switch in HSDP taken to manual
transfer device on 4kv bkr to “HSDP”
all non-T.S. related auto starts are disabled on pump (also all associated lights in CR extinguish)
all auto starts are disabled on pump
How do you transfer control of a 480 v load to the HSDP?
How do you transfer control back to CR?
take “local/ CR” to LOCAL
take “cutin/cutout” toggle switch to CUTIN
take “local/ CR” to CR
take “lockout relay” to RESET
(cutin/ cutout could be in any position)
Why are only half of the 480 v transfer relay toggle switches taken to cutin?
in the case of a fire in the HSDP you wont lose control of all the loads in the CR