CNMT Purge Flashcards

1
Q

Purpose of CNMT purge system

A
  • breathable atmosphere in cnmt for personnel entry in all modes
  • reduce airborne radioactivity => exposure
  • relieve excess pressure and vacuum
  • means to pressurize cnmt for leak rate test
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Describe CNMT purge components

A
  • supply fan (S-3), takes suction thru filter & htr
  • supply CIV’s (FCV-661, 660), huge damper, air open, mech stop, valves leak=> don’t open modes 1-4
  • exh CIV’s (RCV-11,12), damper, air open, mech stop, close on CVI signal
  • exh fan (E-3), takes exhaust and disch to plant vent
  • pressure/ vacuum relief line with 3 CIV’s, one inside CIV (FCV-662), one branch to supply(press relief, FCV-663), one branch to exh(vacuum relief FCV-664)

FCV’s close on CVI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the signals that close CNMT purge supply fan CIV’s (FCV-660, 661)?

A

Si
Man phase A
Man phase B
RM-44A/B alarm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Precautions and limitations for CNMT purge system

A
  • do not purge w/o chem disch permit
  • after op of CVI valves, leak test performed
  • do not op FCV-660, 661, RCV-11,12 in modes 1-4 w/o ops manager position, fail leak test
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How is integrated leak rate test performed on cnmt?

A

Through connection in cnmt purge system via the press/ vacuum relief line (flange)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly