Which of the following statements is incorrect regarding collapse considerations at fires in places of worship?
A: Both older and newer architecture places of worship are susceptible to early collapse.
B: The steeple is the tapered, pointed structure, usually with a Crucifix or other religious artifact at its tip. A dome above a tower is more unstable than a steeple above a bell tower.
C: When the roof fails, it can push the sidewalls out into the street. Conversely, when the sidewalls are weakened by fire and fail, the roof will collapse and fall, along with the ceiling, into the nave or floor area.
D: When evaluating the collapse potential and establishing collapse zones, the exposure 2 and 4 sides due to the bearing walls and the exposure side of the steeple or bell tower (front of the building) are the most dangerous areas during a fire.
B
The steeple is the tapered, pointed structure, usually with a Crucifix or other religious artifact at its tip. A STEEPLE atop a bell tower is MORE UNSTABLE than a DOME above a tower.
PW 4.2, 4.3, 4.6, 4.7
According to basic pumping operations there are a list of guidelines to follow for hydrant use. Which of the below statements is INCORRECT?
A: When first to arrive on the first alarm, the 10’ small hydrant connection or the 35’ soft connection may be used.
B: When other to arrive at the first alarm, the 10’ small connection, the 10’ hard connection, or 35’ soft connection shall be used.
C: When in-line pumping operations are implemented, 3½ hose shall be the initial supply line. 3½ or 2½ hose can be used for augmenting water supply when necessary.
D: When drafting operations are indicated, the 10’ small connection or hard connection must be used.
D TRAINING BULLETINS - APPARATUS P3/EVOLUTIONS 1A D IS INCORRECT – Section 4 D A – Section 4 A B – Section 4 B C – Section 4 F / Evolutions 1A Note 12
The discharge pressure for standpipe operations during a fire on the 72nd floor in a High-Rise building can be found in which choice? A: 400 psi B: 450 psi C: 500 psi D: 550 psi
C
Engine Operations ch 9 p- 6
The color of high voltage cables on Hybird vehicles can be found in which choice? A: Red B: Black C: Yellow D: Orange
D
On most, the high voltage cables are color coded ORANGE. Although some cables are color coded BLUE
***NEVER CUT ANY HIGH VOLTAGE CABLES
Training Bulletins Fires 8 sec 11.6
Several features of rowframe buildings are described below. Which one is incorrect?
A: These buildings can be either balloon or platform construction.
B: The salient feature common to all, regardless of variations in design, is the common cockloft spreading over all the buildings in a row.
C: Common or poorly fire stopped cockloft and cornice permits rapid fire spread into exposures.
D: Light and airshafts are found in some, while not in others. Usually, the buildings of longer length will have the shafts.
A
These buildings can be either balloon or BRACED FRAME construction.
Rowframes 5.1.3, 5.2.2, 5.2.4, 5.2.6
There are times when members may have to utilize their PSS to rapidly exit a room on fire. Of the following choices, which contains incorrect information regarding this evolution?
A: The PSS should only be used after all other means of self rescue have been exhausted.
B: When a member has decided to deploy the Personal Safety System, a Mayday transmission for a “trapped member” must be transmitted.
C: When a point of safety is reached after using your Personal Safety System, the Incident Commander must be notified.
D: Anchoring the hook into the corner of a window is the preferred method of securing the PSS, rather than tying off to a substantial object.
D
If conditions permit, tying off to a substantial object is the preferred method of anchoring the personal safety system.
B Note: In addition to all other required information relayed for a trapped member, include that you are in the process of deploying the Personal Safety System.
Evol 24 3
Which of the following is CORRECT regarding power removal during a natural gas emergency?
A: In most cases, power cannot be removed from the potential blast zone without introducing the risk of ignition.
B: If members can remove power from the area of the leak before natural gas readings reach greater than 80% LEL, it should be done.
C: If any readings display levels greater than 80% LEL, the opportunity to cut power has expired.
D: When unable to locate the source of the leak, do not cut power.
D
EMERGENCY PROCEDURES – NATURAL GAS
D IS CORRECT – 9.2.2
A – Power cannot be removed without introducing the risk of ignition. 9.2.2
B – BEFORE natural gas readings REACH 80% LEL
C – IF any readings display LEVELS OF 80% LEL OR GREATER, the opportunity has expired.
Inflatable water rescue hose can be deployed in either a straight line or loop. Which other feature of this operation is described incorrectly?
A: More than two lengths of hose can be used for larger operations increasing the amount of people that can be supported.
B: Units should have the air filled hose secured with the lifesaving rope.
C: Each looped length is capable of supporting 10 people.
D: Straight line deployment can be used at incidents from a pier or shore involving a few victims within close proximity.
B
Units should have the air filled hose secured with UTILITY ROPE.
Water Rescue 2 Addendum 1: 4.1, 4.2, 4.3
When stretching and operating a foam handline, the incorrect procedure can be found in which choice?
A: Location for the eductor is at the pumper outlet only
B: When using 1 3/4” hose, the maximum stretch is 6 lengths to the nozzle
C: When using 2 1/2” hose, the maximum stretch is 10 lengths to the nozzle
D: 150 PSI shall be supplied to the eductor
D
200 PSI at the eductor
Training Bulletins Evolution 1 sec 2
When operating at a scaffold emergency, the following units are on scene: *1. Ladder Company *2. Squad Company *3. Rescue Company *4. SOC Support Ladder Company. Which units are able to perform glass cutting? A: 2,3 B: 3 only C: 2,3,4 D: 1,2,3,4
A
GLASS CUTTING REQUIRES SPECIALIZED KNOWLEDGE, TRAINING AND EQUIPMENT AND SHALL BE PERFORMED ONLY BY MEMBERS OF A RESCUE OR SQUAD COMPANY.
Scaffold Emergencies 7.1