Scrams Flashcards
RPV level Lo
+12.5”
RPV Stm Dome
1037#
Drywell Press
1.68#
IRM
upscale: 120/125
IRM INOP MU SO HVL
APRM STP Upscale (Flow Biased)
a. ≤0.56+58%
b. ≤0.56(W-10.8%)+58% for SLO
c. ≤113.5% of Rated Thermal Power
APRM Neutron Flux Upscale
a. ≤17% of Rated Thermal Power
b. ≤116.3% of Rated Thermal Power
APRM INOP
a. Mode switch not in OPERATE.
b. Firmware/Software WDT timed out.
c. Critical Self-Test Fault is detected.
SRM Hi-Hi
200000 CPS
SDV Level Hi
a. North Header: 80.5” above inst. zero.
b. South Header: 83.25” above inst. zero.
MSIV Closure
Less than or equal to 92% open
TSV Closure
Less than or equal to 95% open
TCV
Fast closure EHC Trip Oil
530# EHC Trip Oil Press
OPRM Trip
Detection of Thermal Hydraulic Instability