Radiation Monitoring - 1.0 Flashcards

1
Q

What common automatic actions happen during an RBE or RFE high rad?

A

RBVE Dampers Close
RBCS Dampers Close
RBVS and RBVE Fans Trip
FRVS Vent and Recirc Trains Start
RW Supply and Exhaust Fans Trips
CIPS Dampers Close
All SSWS Pumps Start
A&B SACS Pumps Start
EIAC Trips

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What automatic actions occur only during an RBE?

A

Drywell Sump Isolation Valves Close
PCIG Isolates (PCIG Comps Trip)
Noble Gas Monitors Isolate
Post LOCA Recombiners Isolate
H2/O2 Analyzers Isolate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the setpoint for a MSL HI HI Rad?

A

> 3xNFPB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What happens on a liquid radwaste isolation?

A

Radwaste Effluent Hi Rad
Radwaste Hi Effluent Flow
CT Blowdown Low Flow
Loss of Sample Flow
Op Fail on any RM-23A Channel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the RBE and RBF setpoints?

A

RF Exhaust – 2x10-3uci/cc
RB Exhaust – 1x10-3uci/cc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what vents to the North plant and South plant vents?

A

North Plant Vent
Solid RW Exhaust
Chem Lab Exhaust
Gaseous RW

South Plant Vent
Everything Else

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What happens to the CREF fan if the associated Rad monitor alarms?

A

Rad monitor will start the CREF fan for the running supply fan IF that associated detector alarms. If the train is not running, CREF will not start.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What causes aMain Steam Line Inop Trip?

A

Drawer mode switch not in operate OR detector high volt power supply failure
(Loss of RPS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the required logic to get a RM isolation?

A

2 of 3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the power supply for the RMs and what happens if that power supply is removed?

A

The RB/RF rad detectors are powered via the 481 inverters and will send a trip signal when power is removed from the detector or it’s control switch is moved from operate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what must be accounted for in the RM system during HWCI operations?

A

Due to increased N-16 in the main
steam lines during HWCI system operation, MSL radiation monitor setpoints are adjusted upward
prior to HWCI system startup.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What must be done if offgas rad monitor flow is >75scfm?

A

They should be considered INOPERABLE. A correction factor needs to be added in to make them operable again. (From AB.BOP-0006).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What indications would you see in the G. Reactor Building Area Radiation Monitors (ARMs) following a DBA LOCA?

A

Fail upscale due to detector saturation as a result of the expected shine from the high radiation levels inside primary containment. During post accident scenarios, RB ARMs can remain upscale for about 30 days.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly