Q

What are the ECCS Acceptance Criteria?

A
  1. Cladding temperature does not exceed 2200°F.
  2. Cladding oxidation shall not exceed 17% of cladding thickness.
  3. Collable geometry.
  4. H2 generation from zirc/water reaction shall not exceed 1% of the amount generated if all clad reacted.
  5. Long term cooling.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the DBA LOCA criteria?

A
  1. Reactor initially at 102% rated thermal power (3917 MWth).
  2. Loss of offsite AC power
  3. Instantaneous, complete circumferential break of a recirculation pipe at the suction nozzle.
  4. Loss of a channel A DC source (disabling HPCI, one loop of Core Spray, and one loop of LPCI)

Note: The initial reactor power used in the DBA LOCA Containment analyses is 105% (4031 MWth).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the ECCS systems and what are their ratings?

A
  1. HPCI – Designed for breaks < 1” in diameter.
    • 3000 gpm - A CS line, 2600 gpm – A FW line, Initiates -38”, 1.68#, manual
  2. Core Spray – Two 100% capacity loops.
    • 3175 gpm per pump (6350 gpm per loop), 461 psi inj open permissive, 380 psi shutoff head.
  3. LPCI – Four 100% capacity loops.
    • 10000 gpm (x4), 450 psi inj permissive, 340 psi shutoff head (171 psi for rated flow). -129”, 1.68#
  4. ADS – Assist HPCI by depressurizing the plant in the event of a small break LOCA where HPCI cannot maintain level.
    • A thru E SRV’s used to depressurize RPV on -129 and 1.68 psi drywell (or timer)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How much time do you have to respond to a DBA LOCA?

A

10 mins.