1E-AC - .5 Flashcards

1
Q

Switchgear Bus Differential O/C or Bus O/C

A
  • Trips supply breaker and blocks closure of alternate
  • Trips and locks out all load/motor feeder breakers
  • Initiates breaker failure protection
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

1E Switchgear Bus Undervoltage transfer actions:

A

a) If the incoming feeder voltage is <92% for 20 seconds, OR bus voltage decreases to <70% of normal, a degraded bus voltage transfer is initiated.

b) IF bus voltage is < 70%, 27 device trips (regardless of the feeder voltage conditions), the normal breaker will trip and the alternate breaker will close following a .7 second* time delay, provided:
i. AUTO CLOSE BLOCK is not selected.
ii. Associated feeder voltage is ≥ 94%
iii. No lockouts present
iv. Normal supply breaker is open

  • The alternate supply breaker will close to supply power to the bus following a time delay of 0.7 seconds. The time delay is to ensure motor breakers are open prior to closure of the alternate breakers. Motor feeders on class 1E USS have time delayed (.25 seconds) undervoltage relays which trip the motor feeder breakers from the bus.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What occurs when 27 device trips?

A

a) All motor circuit breakers are tripped (.25 sec TD).
b) LOP Sequencer is initiated (.5 sec TD after EDG breaker closure)
c) PSIS block loads start (.5 sec TD)
d) Emergency start of EDG if both normal and alternate infeed voltages are <92%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

EDG will start conditions:

A
  1. LOP
    a) Both incoming feeder voltages ≤92% (20 sec TD) (Degraded Voltage)
    b) Both incoming feeder voltages ≤92% AND Bus voltage < 70% (LOP)
  2. LOCA: 1.68 psig or -129.
  3. Manual initiation of core spray logic.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

4160V BRK local emergency takeover

A

Almost all breakers have local emergency takeover capability.

  1. Breakers operated from the RSP CANNOT be operated locally from the switchgear rooms
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Supply Breakers operated in emergency takeover can be closed IF:

A
  1. Associated EDG output breaker is open
  2. No bus Lockouts
  3. Associated Station Service Transformer Lockout reset
  4. EDG breaker failure lockout reset
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Infeed BKR numbers for 401-404.

A

For 401 and 403, 40X08 is the Normal infeed, For 402 and 404, 40X01.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

LOCA level 1 and level 2 breaker trips

A

Generally speaking, a LOCA level 1 will trip your bottom Non-1E breakers and a LOCA level 2 / Hi-Hi Rad signal will trip your upper breakers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Requirements for the EDG output breaker to close

A
  1. EDG Ready to Load:
    a) Frequency > 57 Hz (95%)
    b) Gen Terminal Voltage > 3950 V (95%)
  2. Switch Gear Permissive:
    a) Both Normal and Alt. Feeder Breakers Open
    b) Bus Voltage < 70%
    c) EDG Lockouts Reset
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

10A401 Loads

A
  1. A SACS Pump
  2. A Core Spray Pump
  3. A RHR Pump
  4. A SSWS Pump
  5. AK403
  6. 10B410
  7. 10B450
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

10A402 Loads

A
  1. B SACS Pump
  2. B Core Spray Pump
  3. B RHR Pump
  4. B SSWS Pump
  5. BK403
  6. 10B420
  7. 10B460
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

10A403 Loads

A
  1. C SACS Pump
  2. C Core Spray Pump
  3. C RHR Pump
  4. C SSWS Pump
  5. AK400
  6. 10B430
  7. 10B470
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

10A404 Loads

A
  1. D SACS Pump
  2. D Core Spray Pump
  3. D RHR Pump
  4. D SSWS Pump
  5. BK400
  6. 10B440
  7. 10B480
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

LOP vs LOCA signal priority.

A

LOCA signal will override LOP.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

UPS input voltages

A

a) Normal power – 480VAC
b) Alternate power – 125 VDC (inop if DC unavailable)
c) Backup power- 480VAC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

LOCA Sequence.

A

TIME – SEC** LOCA
T=0 EDG output bkr closes
T=6 FRVS
T=17 EDG RECIRC FANS (AULD) CRS; CRRA; CREF;
T=32 SACS PUMPS
T=42 SSW PUMPS
T=47 AK400 / BK400 CABE
T=52 SWGR ROOM COOLERS AP400;BP400
T=57 CERS
T=62 AK,BK403 AP,BP414
T=67 A,BVH407,408 FANS
T=72 —
T=82 EDG RECIRC FANS (AUTO)

** Time starts when power is available.

11
Q

LOP Sequence.

A

TIME – SEC** LOP
T=0 DRYWELL FANS 9530A1,A3 – B1,B3 – (X)
T=6 RBVS
T=17 EDG RECIRC FANS (AULD) CRS; CRRA; CREF;
T=32 SACS PUMPS
T=42 SSW PUMPS
T=47 AK400 / BK400 CABE
T=52 SWGR ROOM COOLERS AP400;BP400
T=57 CERS
T=62 AK,BK403 AP,BP414
T=67 A,BVH407,408 FANS
T=72 RACS(A,B) 9530A2,A4 – B2,B4 – (0)
T=82 EDG RECIRC FANS (AUTO)

12
Q

Why is 125VDC breaker control power (417 panels) important?

A

Without 125VDC control power, 1E breakers are locked into their current configuration and are unable to trip or close under any circumstance.