SRO Tech Spec Systems Review Flashcards

1
Q

Per TS 3.4.6, RCS Loops, what is required for Operability in Mode 4?

A

2 RCS or RHR loops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Per TS 3.4.7, RCS Loops Filled, What is required for Operability in Mode 5 with Loops Filled?

A

1 RHR loop
AND
1 more RHR loop OR 2 S/G water level 420” > WR level inst

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Per TS 3.4.8, RCS Loops Drained, what is required for Operability in Mode 5 with Loops Drained?

A

2 RHR loops OPERABLE
with 1 RHR loop in operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Per TS 3.5.2, ECCS Operating, what is required for Operability in Modes 1-3?

A

Two ECCS trains shall be OPERABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Per TS 3.5.2, ECCS Operating, what is required for an operable Train?

A

CCP/SI/RHR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Per TS 3.5.3, ECCS Shutdown, what is required for Operability in Mode 4?

A

1 ECCS train OPERABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Per TS 3.5.3, ECCS Shutdown, what is required for an operable Train?

A

CCP/RHR

SI is not required!

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Per TS 3.9.4, Refueling RHR + Coolant Hi Level, what is required to be Operable in Mode 6 with ≥ 23 ft above the top of reactor vessel flange?

A

1 RHR loop OPERABLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Per TS 3.9.5 Refueling RHR + Coolant Level Low, what is required to be Operable in Mode 6 with < 23 ft above the top of reactor vessel flange?

A

2 RHR loops OPERABLE with 1 RHR loop in operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If the RWST is INOPERABLE per TS 3.5.4, RWST, must the actions for an inoperable ECCS System be performed?

A

If RWST is INOPERABLE, do NOT cascade Tech Specs to the ECCS Trains. Although the specs would NOT be met, per LCO 3.0.6, the actions of the RWST address it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the basis for having ≥23 ft over irradiated fuel in racks per TS 3.7.14, SFP Level?

A

Minimum level meets the assumptions of iodine DF following a fuel handling accident.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

If there is an inoperability of the 250 vDC system, what else should be considered?

A

ESW Train is INOP and other unit is affected with cross tie open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If the normal source of power (250 vDC) is out of service for a CRID, how is operability affected?

A

Inverter INOP, but CRID BUS is OPERABLE.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If a CRID is powered from CRP-3, how is operability affectd?

A

Inverter and Bus are bother INOP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the Tech Spec minimum level for the CST and the basis behind that level?

A

182,000 gallons to Maintain plant in hot sby for 9 hrs on PORVs w/LOOP
-OR-
Capability of holding the Unit in Mode 3 for 2 hrs followed by a 4 hr cooldown to RHR at 50°/hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When MUST the TDAFP be operable when bringing a unit back online?

A

Mode 4 when SG is relied upon for heat removal. However… SR 3.7.5.2 is NOT required to be performed for the turbine driven AFW pump until 24 hours after ≥ 850 psig in the steam generator.

17
Q

Per TS 3.1.1, SDM, what must be done is SDM is outside of the limits provided in the COLR when required?

A

Borate to restore (15 minutes)

18
Q

What is the purpose of maintaining Seal Line Resistance per TS 3.5.5, Seal Injection Flow?

A

if too SMALL, ECCS injection flow may be less than required for core cooling during a LB LOCA

19
Q

What are the electrical requirements for ESW per tech specs?

A

Required - 2 offsite sources + EDG + DC
Opp Unit - 1 offsite (EP must be I/S to count) + EDG + DC

20
Q

What is the highest lake temperature allowed per TS 3.7.9, UHS?

A

86.9°F

21
Q

How does the inoperability of an ESW Pump affect the Opposite Unit when cross-ties are open?

A

If ESW PUMP is INOP, EDG is INOP and opp Unit Hdr is INOP, so their EDG is INOP (cross-ties open)

22
Q

How does the inoperability of an ESW header affect the Opposite Unit when cross-ties are open?

A

If Hdr is INOP, the PUMP could still be OPERABLE. If so, the other unit is not affected.

23
Q

What is the basis of the Main Staem Safety Valves per TS 3.7.1, MSSVs?

A

Operability of SVs ensures secondary steam pressure will be limited to 110% of desired pressure during most severe anticipated operational transient

24
Q

Per TS 3.7.4, SG PORVs, when is a SG PORV Operable?

A

Considered OPERABLE when capable of fully opening from control room

25
Q

Per TRO 8.3.8, Radiation Monitoring Instrumentation, when is a PORV Rad Monitor INOPERABLE?

A

If PORV manual isolation valve is closed, Rad Mon is INOP or If PORV controller is in manual, Rad Mon is INOP

Any time PORV will not automatically open

26
Q

What is the design basis of the SG PORV per TS 3.7.4, SG PORVs

A

To cool down the unit to RHR entry conditions in Manual following a SGTR

27
Q

Per TS 3.4.11, PORVs, what must be done if a Pressurizer PORV is inoperable with manual available?

A

close block valve & maintain power within 1 HR

28
Q

Per TS 3.4.11, PORVs, what must be done if a Pressurizer PORV is inoperable with manual NOT available?

A

close block valve & remove power within 1 HR

29
Q

Per TS 3.4.11, PORVs, what must be done if a Pressurizer PORV Block Valve is INOPERABLE?

A

PORV to Man 1hr

30
Q

What is the ECCS Acceptance criteria per 10 CFR 50.46?

A
  • Peak clad temperature < 2200°F
    • Max clad oxidation < 17%
    • H2 generation < 1% hypothetical maximum
    • Core maintains a coolable geometry
    • Long term abundant cooling
31
Q

Per tech specs, what are the temperature limits for containment?

A

Upper: 60-100°F
Lower: 60-120°F

32
Q

Per tech specs, what are the pressure limits for containment?

A

-1.5 psig - +0.3 psig

33
Q

Per TS 3.4.3, RCS Pressure vs Temperature, what is the maximum heatup rate for the RCS?

A

< 60°F/ 1 hr

34
Q

Per TS 3.4.3, RCS Pressure vs Temperature, what is the maximum cooldown rate for the RCS?

A

< 100°F / 1 hr

35
Q

Per TS 3.4.2, RCS Minimum Temp, what is the mimum temperature allowed? What must bd done if not med?

A

541°F
Be in M2 with keff < 1 in 30 minutes

36
Q

Per TS 3.4.3, RCS Pressure vs Temperature, what must be down if the RCS heatup or cooldown rates are violated in Modes 1-4?

A

Restore in 30 minutes

37
Q

Per TS 3.4.3, RCS Pressure vs Temperature, what must be down if the RCS heatup or cooldown rates are violated in Modes 5-6?

A

Restore Immediately