Ctrl Room Ventilation Flashcards

1
Q

How does ESW interface with the CRAC?

A
  • Cooling water for condensers
  • Backup supply for cooling coils
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Will the CRAC chiller trip off with a loss of ESW?

A

Yes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When is the backup cooling capability lost with respect to ESW to the cooling coils?

A

Backup capability lost if ESW > 65°F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the CR Pressurization Fan starts?

A
  • SI in either Unit (Train Spec)
  • CR High Rad (Unit Specific)
  • CRCV Fire (CO2 or Halon actuation)
  • Manual
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What the trips of the CRAC chiller package?

A
  • High/Low Pressure
  • High/Low Oil Pressure
  • Low Temperature
  • Overload
  • Load Conservation (Fan is unaffected)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How do the AHU Temp Control Valves (VRV-315/325) fail on a loss of air?

A

Fail open (full flow to chillers)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When will Control Room vent intake damper no. 1 dampers ACRDA-1 / 1A be open?

A

During normal operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When will ACRDA-2 / 2A CREV outside dampers be part open?

A
  • CRCV fire
  • Hi Rad
  • SI in either unit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When will ACRDA-3,
C/R recirc damper be open?

A
  • Norm operation
  • Hi Rad
  • SI either unit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If there is a toxic gas leak, how are all 3 of the CR dampers aligned?

A

Manually closed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the CR Vent Dampers positions during a SI, High Rad or Fire?

A
  • 1/1A CRAC outside supply always close
  • 2/2A CREV outside supply always part open
  • 3 CREV C/R recirc is usually open - Closes on FIRE ONLY
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

If U-1 gets a CRCV Fire signal and All U-1 CR Vent Sys Auto actions occur as expected
THEN
U-1 gets a CR High Rad signal,
Does U-1 CR vent Sys realign?

A

No, “First in Wins.”
The U-1 CR Vent System stays aligned for the U-1 CRCV Fire signal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When will HV-ACR-DA-2A Clean Up Intake Damper go to part open?

A

If HV-ACR-DA-2 isn’t in part open after 45 sec since actuation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Per TS 3.3.7 B (CREV system Actuation Instrumentation), what must be done if ONE or more required functions with 2 trains INOPERABLE, what must be done:

A

IMMEDIATELY:
- Place one CREV train in pressurization/cleanup mode
AND
- Enter applicable Conditions and Required Actions for 1 CREV train made Inoperable by Inoperable CREV actuation instrumentation
OR
- Place both CREV trains in pressurization/cleanup mode

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Per TS 3.7.10 B (CREV system), what must be done if 1 or more CREV trains Inoperable due to CRE Boundary in Modes 1-4

A

IMMEDIATELY:
Initiate action to implement mitigating actions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Per TS 3.7.10 F (CREV system), If 2 CREV trains inoperable during movement of irradiated fuel assemblies OR 1 or more CREV trains inoperable due to an inoperable CRE boundary during movement of irradiated fuel assemblies

A

IMMEDIATELY:
Suspend movement of irradiated fuel assemblies

17
Q

Per TS 3.7.10 G (CREV system), if 2 CREV trains inoperable in Modes 1,2,3,4 for reason other than B (CRE Boundary) and C (filter), what must be done?

A

IMMEDIATELY Enter LCO 3.0.3

18
Q

Per TS 3.7.11 D (CRAC system), what must be done If 2 CRAC trains Inoperable during movement of irradiated fuel assemblies?

A

IMMEDIAELY Suspend movement of irradiated fuel assemblies

19
Q

Per TS 3.7.11 E (CRAC system), what must be done if there are 2 CRAC trains INOPERABLE?

A

IMMEDIATELY Enter LCO 3.0.3

20
Q

What is the design function of the Control Room Ventilation System?

A

Maintains the CR environment habitable during and following Design Basis Accident (DBA) events, consistent with 10CFR50.

21
Q

What makes up the control room envelop (CRE)?

A

Control room, heating, ventilation, AC equipment room, and PPC Room

22
Q

What is the quantitative limit for smoke per TS 3.7.10 (CREV System)?

A

There isn’t one. It is qualitative based on SM Discretion

23
Q

Is the CREV System required to be OPERABLE to ensure hazardous chemical limits are not exceeded?

A

NO! Analysis has determined it is not required to be operable

24
Q

During normal ops, CA to CPR inlet Volume damper VDC-207 is lost due to a small leak at the air valve. How is CPR operation affected? Assume the leak does not result in a loss of CA to any other component or system.

A

System can be operated at full flow as the damper fails open.