AOP Basics Flashcards

1
Q

There is steam biding in the AFW system. The procedure has you check Rx Power less than 97%. Why?

A

Because cold AFW will raise power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If there is a dropped or misaligned rod, what must Tave-Tref deviation be maintained at?

A

+/- 3 degreed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

East charging pump is in run and the west pump is in neutral. What must be done if the east pump trips off in order to restore pressurizer level control back to normal?

A

Manually start the west CCP, take charging to minimum, and restore letdown.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What must be done if bus duct cooling is INOPERABLE?

A

Immediately reduce bus loading to 10,000 amps/phase (~40% turbine load)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How does the turbine trip controller work for steam dumps?

A

Trips 1 group open at a 10 degree difference and a second group open at a 20 degree delta.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is affected if one rod falls into the core?

A

Radial Power Distribution

NOT SDM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During a PR Failure, Tech specs give you 1 hour to

A

Verify P-7, P-8 and P-10 status

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

During continuous rod motion, what is the preferred recovery of low RCS temperature to restore equilibrium conditions?

A

Reduce turbine load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What must be done if a SG Tube leak exceeds 50 gpm?

A

Trip the Reactor and go to EO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During a loss of CCW, you check CCP status in attempt to save 1 CCP for operations upon CCW Restoration. What do you do in Modes 5-6?

A

Stop both CCPs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the immediate actions of a tripped HDP?

A

NONE! Check to ensure proper plant response

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

VCT Level instrument QLC-451 is responsible for _____. Are there any alarms?

A

Makeup at 14 % to 24%
Divert trips open at 87%

Alarms for High and low level, as well as MU not in auto

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Per TS, if a leaky PRZ PORV is not capable of being manually cycled, you have….

A

1 hour to close block valve and 1 hr to remove power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the RO stable parameter Reports?

A
  1. Reactor Power- LEFM, NI or DT
  2. RCS Temp
  3. RCS Pressure
  4. PRZ Level
  5. Delta I
  6. Controllers in Manual
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What issues can the BOP use IFR-001 for?

A

SG Pressure / Level Control
MFP DP
FW Htr Level
LO Temp

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

At 99% power and with rods in auto, continuous rod motion begins. Rods are inserted below the low-low RIL. What must be done?

A

emergency boration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

If there is a turbine lagging fire, what must be done?

A

Send AEO to verify with local observation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

If frequency is < 59 Hz but >58.2 Hz Then….

A

Trip Reactor in 30 mins per E-0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is the cutoff for containment inspection for a RCS Leak?

A

> 1 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What must be done if ALL aux building Exhaust fans (both units) fail?

A

Request RP to verify all AB doors that lead to uncontrolled areas closed AND verify that AB pressure is negative within 30 mins

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

When recovering a single dropped rod, Why must power be stable? And for how long?

A

Because of xenon. It should be stable for 48 hrs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

If you lose CRID 1 or 4, will the red handle switches work for a manually SI Actuation for that train?

A

NO!

Each pump must be started manually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Per LTOP TS, if there are 2 CCPs capable of injections, you must….

A

Immediately restore to max of 1 CCP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What are possible indications of CCW Inleakage?

A
  1. Rising Surge Tank Level
  2. Rad Monitor Alarm
  3. Rising tritium concentration
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

When is RHR operation not permitted?

A

Less than 614’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

What are the Plant and

control air key pressures and ACTIONS?

A

95 psig - Sby PAC Starts
90 psig - CAC Starts
85 psig - PA Ring Hdr Isolates
80 psig - Manual Trip Required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Entry conditions for E-0

A

M 1-3 with SI

M 1-2 with Rx Trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

When implementing the High Reactor Coolant Activity our Failed Fuel AOP, what should be done with CVCS and why?

A

Charging and LD should be maximized thru the LD Demins to maximize clean up.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

During a loss of CCW, you check CCP status in attempt to save 1 CCP for operations upon CCW Restoration. What do you do with 1 CCP available?

A

Place C/S in lockout- SAVE ONLY PUMP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

When temperature is dropping rapidly during a secondary transient, what should you do with rods?

A

Do NOT withdraw them manually bc it would be a second positive reactivity addition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

If screen DP is > 50” or trashrack DP is > 24 “, what do you do?

A

Trip both units and enter E-0

Close Stop valves and trip ALL CW pumps and verify disch valves closed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What are potential sources of CCW out-leakage?

A

RCP Seal Return Hx

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

Containment pressure channel 2/3/4 are indicating normal and channel 1 is failed high. Actions per AOP complete. MTI requests permission to test containment channel 3. What is the appropriate response to the request?

A

Surveillance should be allowed since it takes a minimum of 2 additional protection channels to actuate an SI or Containment spray.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

What condition must exist before starting a RCP?

A

DP across No 1 seal must be greater than 215 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

What are the Control Room Operator actions necessary during an irradiated fuel handling accident in the spent fuel storage area?

A

Sound NEA

If vent stack rad monitor levels are rising, secure both trains of SFP supply fans from service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

While making preparations to locate and isolate the thimble tube leak, detector “C” fails to move into the storage position. Which one of the following locations should be used for a safe parking position?

A

Directly under the reactor core

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

How does the CCP ELO work with a standing SI signal?

A

2 sec delay, then operates to maintain 1812-1825#s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

If a Tcold instrument fails high, what are the effects?

A

OP delta T and OT delta T lowers

Delta T gets smaller

Tavg gets larger

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

With 120 gpm letdown in service and blender controls in automatic, QLC-452 fails to 100%. With no operator action, actual VCT level will:

A

Lower to zero and eventually result in loss of CCP suction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

During a loss of CCW, the operator verifies all 4 CRDM Fans are running. Why?

A

Cools Rx Head during natural circulation cooldown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

What must be done if a RCS leak exceeds the capacity of 2 CCPs?

A

Trip the Reactor and Enter E-0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

During a RCS leak, what should be done if containment pressure approaches 1 psig?

A

trip the Rx and Enter E-0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

What are the BOP E-0 Immediate actions?

A

Turbine Trip
a. All turbine stop valves closed status lights – LIT

Power to AC Emergency Buses

a. AC Emergency buses – at least 1 energized. T11A or T11D
b. AC Emergency buses – all energized. T11A, T11B, T11C, T11D

SI Status
a. SG pressures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

What is the expected plant response to a loss of control air?

A

PRZ Spray valves fail closed (backup air used)

Blender and LD Isolate

SG PORV (nitrogen backup)

Ctmt cooling lost

CCW Flow lost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

What is the system response to a high rad on R-5 for SFP Area?

A
  1. Places FHA exhaust fan in charcoal mode (if not already there)
  2. Trips SFP Supply Fans
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

Which one of the following effects will result from an Intermediate Range compensated ion chamber detector that is UNDER COMPENSTED?

A

P-6 status light energizes much sooner than normal during a reactor startup

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

How do you identify leaking thimble tubes?

A

measure thimble tube temps 6” above tube isolation valves (greater than ambient)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

After a spurious Phase A Isolation, what should happen after it is reset?

A

CUVs should autostart

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

What is the RCP Trip Criteria for the foldout page?

A
  1. Complete Loss of RCP Seal Cooling
  2. # 1 Seal Leakoff Temp - 185*F and loss of seal injection
  3. # 1 Seal Leakoff Temp - 200*F
  4. RCP Lower Bearing Water Temp - 225*F
  5. RCP Upper Motor Bearing Temp - 200*F
  6. RCP Vibes - 20 mils
  7. # 1 Seal Leakoff > 6 gpm
  8. # 1 Seal Leakoff < 1 gpm and temp rising
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

AES fan 1 charcoal filter fire or abnormal is lit, Operator has confirmed a fire exists. Which actions should be taken

A

Manually open deluge isolation valve, Verify deluge valve opens, Start 2-HV-AES-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

What is needed for AMSAC actuation?

A

3/4 Feed Flows < 25%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

What happens if CRID 1 is lost?

A

Train A SSPS slave relays lose power

All 4 FRVs close on FWI

Rx Trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

What happens if PRZ Level bistable channel fails high?

A

NOTHING other than an alarm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

If there is a PR failure high, what will rods do?

A

Rods step in due to mismatch. Rods will NOT withdraw due to temp deviation after the power mismatch decays bc of PR Rod Stop C2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

How low must the CCW Surge tank be lowered to figure out which header the leak is on?

A

baffle height ~ 48”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

At what pressure does CRV-224 begin modulating open? Trips?

A

240# CRV-224 begins to modulate

210# CRV-224 trips open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

What must be done if rods are inserted below the low low rod insertion limit?

A

Emergency Borate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

Following the resetting of a SI and Phase A, the control air containment isolation valves failed to open. Which one of the following describes the current status of the plant?

A

RCS charging is available but letdown can not be restored

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

What are the indications of an uncontrolled dilution?

A

Rise in power and temperature

Rod insertion

Audio count rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

What must be done if there is a fire in the AES Fan?

A

STOP AES Fan, as it does not auto trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

What are potential sources of CCW in-leakage?

A
LD Hx
RCP Thermal Barrier Hx
XS LD Hx
SFP Hx
NBAE
WGC
Fill Valve
RHR
Opp Unit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
62
Q

A load rejection at ______ presents the greatest short term plant operational challenge due to the ______ MTC reactivity feedback allowing a larger rise in Tave.

A

BOL

Lower

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
63
Q

Grid frequency must be maintained …..

A

greater than or equal to 59 Hz

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
64
Q

What are the operator actions for loss of SFP Cooling?

A

Stop SFP and skimmer Pumps if SFP level < 23’8”

Stop SF Movement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
65
Q

If below P-8 and there is a total loss of NESW, what must be done?

A

Trip MT and MFPs

Break Condenser Vacuum

Stop MT LO Pumps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
66
Q

What must be done if there is an fuel handling accident outside of containment?

A

Accident analysis for control room habitability assumes CR Pressurization/cleanup filter system is placed in operation within 20 mins in order to prevent exceeding the limits.

67
Q

What must be done is more than 1 rod drops?

A

Trip the Rx! We are not analyzed for 2 dropped rods

68
Q

What happens if a second ground appears on the generator?

A

Excessive field current may develop and could damage the Main Generator

69
Q

What is the RCP Malfunction criteria requiring a plant shutdown and stopping of the RCPs in less than 8 hrs?

A

1 Seal Leakoff > 5.4 gpm

Seal Leakoff flow < expected range for RCS pressure and can’t be restored

RCP Motor temp ≥ 145 ºC

70
Q

How do we identify a leaky SG Tube?

A

High rad from any blown line on R-19

Have chemistry sample SG with suspected leak last

71
Q

What will happen when recovering a misaligned rod?

A

Rod Control Urgent Failure will occur when the non moving rod group does not move

72
Q

For loss of Control Room Annunciators, what is the difference between a UE and an Alert?

A

For an alert, you are also in EITHER a transient or don’t have compensatory indications available.

73
Q

If the RCP Seal # 1 Outlet Temp Alarm is lit, what is the natural circ cooldown limit?

A

Seals are bad

Cooldown at less than 100*F/hr

74
Q

What happens if train A loses 250 VDC?

A

Generator does not trip - 33 VED does not energize

Train B ECCS will still initiate but Train A does not due to loss of CRID 1 (slaves)

75
Q

What are some effects of a spurious phase A?

A

Seal Return isolates, causing seal return safety to lift to the PRT

LD isolates

Minimum Charging flow

76
Q

Considering only the response of the pzr level control system, which one of the following pzr level channel failures will NOT result in a rx trip on high pzr level

A

bistable channel fails high

77
Q

What are 2 Operator Actions taken during the loss of refueling water level during refueling?

A

Move xfr cart to SFP side

Close WIER Gate

78
Q

What do rods do if MPC-253 fails low?

A

rods step in

79
Q

During a loss of ESW, there is a TCA to isolate the affected header within ______ of rupture in aux building

A

21.4 mins

80
Q

Control banks D is below its rod insertion limit and AFD is outside target band. What must you do immediately?

A

emergency borate

81
Q

What are the immediate actions for loss of 1 MFP?

A
  1. U2 ONLY- Verify power < 90%
  2. Check Turbine Runback to 626 (730) MW. IF NOT, manually reduce load
  3. Maintain Tave on program
    - Preferred with Rods in AUTO
    - If AUTO Rod Control NOT available, operate Rods in Manual
  4. Close tripped MFP ELOs
  5. # Maintain Steam/Feed Flow mismatch
  6. # Start Standby pumps (Hotwell, CBP)
  7. # Start AFW pumps as required
  8. # U2 ONLY- Check running MFP on MS. Raise FPT steam pressure controller AUTO setpoint to 105 psig
  9. U2 ONLY - Take MT to MW Out (prevents additional runback)
82
Q

An RCS leak rate determination quantifies a small leak. During the investigation process, the operators noted an abnormal continuous rise in the dirty sump tank. The next action that the crew is directed to take per the procedure is:

A
  1. Take manual control of charging and letdown if necessary

2. Place XS LD I/S and then isolate normal letdown

83
Q

In the control air malfunction AOP, there is a caution referring to a potential for a SI from…

A

uneven cooling of the Steam Generators

84
Q

What must be done if we receive an RCP Fire?

A

dispatch AEO to the CAS panel to determine if a real fire exists

85
Q

What are the RO E-0 Immediate actions?

A

Rx Trip

a. Rx Trip and Bypass Breakers-OPEN
b. Rod Bottom Lights – LIT
c. All Rods - < 10 steps
d. Neutron Flux- lowering

SI Status

a. “Safety Injection Actuated” status light – LIT
b. Primary: check SI white sugar cubes above QMO-225 and 226

If not, check RCS and Ctmt Pressures

86
Q

If a running west CCW Pump gets an SI Signal simultaneously with a load shed signal, what happens?

A

Pump stops and is restarted by its sequence timer

87
Q

During a loss of CCW, you check CCP status in attempt to save 1 CCP for operations upon CCW Restoration. What do you do with 2 available CCPs?

A

Run 1 to failure, save 1 for later (PTL)

88
Q

During a RCS leak, what must be done if VCT Level cannot be maintained?

A

Trip the Rx and Enter E-0

89
Q

What are the degraded forebay foldout page criteria requiring trip of all CW pumps?

A

Loss of Screen Integrity (debris intrusion in pump bay east of screens)

Screen DP > 50” OR Trash Rack DP > 24”

Screen DP > 25” with frequent ESW Strainer Backwashing

Screen DP > 40” AND NOT Lowering with BOTH of the following:
o ALL available screens running
o Only 2 CW Pumps running on each Unit

Screen forebay level < 562 feet

90
Q

What do rods do if Tave or PR fails low?

A

NO rod motion

91
Q

To determine a leakrate, what is the flow used for XS Letdown if it’s in service?

A

20 gpm

92
Q

When is a fire an alert?

A

It affects plant operation

93
Q

During a Loss of ESW, what should the status of the cross ties be?

A

Closed for the unaffected unit

94
Q

What do rods do if Tave fails high?

A

rods step in

95
Q

The Rapid Power Reduction Fold Out Page

A

If any of the following exist, Trip reactor and go to E-0

  1. Power reduction is determined to be uncontrolled
  2. > 10%/min load reduction rate
  3. Tavg - < 541 ºF or > 579 ºF
  4. Tavg - Tref mismatch can NOT be maintained within 5 ºF
96
Q

Will you get more of a temperature feedback at BOL or EOL on a load rejection?

A

More temperature feedback at EOL because of the larger negative MTC

97
Q

Per Loss of RHR Cooling, what is the preferred method of heat removal if all RHR cooling is lost?

A

AFW pumps to feed SGs for steaming

98
Q

What happens if PRZ Level bistable channel fails low?

A
  1. Letdown isolates (QRV-111 closes, LD orifice isolations close)
  2. PRZ Heaters Trip Off
  3. PRZ Level Rises
  4. 2/3 92% Rx Trip
99
Q

Who is the liaison between fire brigade and the unit during a fire?

A

Work Control SRO

100
Q

Per LTOP TS, if there is an accumulator not isolated when not depressurized, you have….

A

1 hour to isolate the accumulator

101
Q

What are the entry conditions for the abnormal for irradiated fuel handling accident in containment building?

A

High rad alarm on VRS-1500, vent stack monitor

102
Q

What is an input to MFP Speed control?

A

TOTAL Steam Flow

103
Q

Will a single ground harm the generator?

A

No

104
Q

What is needed for C-20?

A

2/2 turbine impuls pressures > 40%

105
Q

Why do we keep the generator connected to the grid until the turbine stop valves are closed?

A

So we don’t overspeed the turbine

106
Q

CCP Recirc valve QMO-226 (West) is controlled by _____

A

NPP-153

107
Q

What happens is MPC-254 fails high?

A

Channel 2 High Steam Flow setpoints rise

C7A and C7B load rejection bistables disabled

AMSAC initiation time is reduced.

108
Q

What do you do if the main transformer hi-hi coil temperature is received?

A

send an AEO out to start additional fans

109
Q

During severe weather with offsite power still available, what’s the status of the EDGs?

A

Stopped and in standby to prevent a fault int he switchyard from damaging the EDGs

110
Q

What should you NOT do if CCW failure is due to a hydraulic condition?

A

Do NOT Cross-Tie CCW. Doing so could cause a pipe to break, air bind or cavitate the pump

111
Q

What happens if CRID 3 is lost?

A

most survivable

112
Q

What is the #1 seal issues requiring plant shutdown in more than 8 hrs?

A

1 Seal Leakoff > expected range for RCS Pressure AND any of the following:

RCP thermal barrier DP low alarm

Lower Bearing Temp > 175 ºF

Rising #1 Seal Leakoff Temp

113
Q

If channel 1 feed flow channel is selected and instantaneously fails offscale low, what happens with no operator action?

A

SG Level control system will auto transfer the FRV controller to manual and maintain the current valve position

114
Q

What do rods do if PR fails high?

A

rods step in

115
Q

The unit is at 100% power and condenser vacuum drops from 28 inches to 25 inches. All 4 SJAEs are in service and the system is in normal configuration. What could be the problem?

A

Loss of condensate flow to the SJAE condensers

116
Q

During a loss of NESW, there may be plant flooding. How man RCPs should be stopped after the reactor is tripped?

A

All but 1 RCP

117
Q

What happens if CRID 4 is lost?

A

Train B SSPS slave relays lose power

All 4 FRVs close on FWI

Rx Trip

118
Q

What does the TDAFP Discharge Flow High alarm indicate?

A

Aux Feed Flow Retention has actuated

119
Q

If rods continue to withdraw when placed to manual, what must be done?

A

Trip the Rx

120
Q

Under which conditions must the unit be shutdown during an earthquake?

A
  1. Sustained visible system or structural damage
  2. EPlan Alert or Higher
  3. Shutdown determinations within 24 hours of the event are not complete
121
Q

If frequency is < 58.2 Hz…

A

TRIP THE REACTOR NOW!

122
Q

What does AMSAC do?

A

Trips turbine and starts all AFW pumps

123
Q

Which one of the following describes the procedural actions in response to addressing a leaking PZR PORV?

A

All block valves are initially closed to lower PORV tailpipe temp. One block valve is opened at a time. Leakage is determined by a rise in tailpipe temperature after each block valve is opened.

124
Q

What are possible indications of CCW Out Leakage?

A
1.	Lowering CCW Surge Tank Level 
(makeup from DW to maintain 60”-120”)
2.	Rising VCT Level &amp; Pressure
3.	Tave Rising
4.	Rx Power Rising
5.	PRZ Level and Pressure Rising
125
Q

If there is a dropped rod, how must power be reduced and why?

A

only by boration to prevent exaggerating any existing flux tilts

126
Q

VCT Level instrument QLC-452 is responsible for _____. Are there any alarms?

A

Beginning to divert at 78% and full divert at 87%. There is a Low level alarm only

127
Q

What are the indications of a dropped or misaligned rod?

A

Power range lower detector deviation alarm is lit

Power range channel deviation alarm is lit

NIS tilt computer alarm is lit

Tavg is rapidly lowering

128
Q

Per LTOP TS, if there is a SI capable of injection, you must….

A

immediately make all SI not capable of injection

129
Q

What is the loss of 1 MFP fold out page criteria requiring a reactor trip?

A
  1. Power Reduction is uncontrollable
  2. Tave < 541ºF OR Tave > 579 ºF
  3. SG Level approaching Hi-Hi or Low-Low Setpoint
130
Q

What are the BOP stable parameter reports

A
  1. MT Loading and MW IN or OUT
  2. SG NR Levels
  3. MFP DP and Mode of Control
  4. Controllers in Manual
131
Q

What happens if PRZ Level control channel fails high?

A
  1. QRV-251 closes to minimum stop (40 gpm)
  2. PRZ backup heatesr on
  3. PRZ level lowers
  4. PRZ low level 17% (QRV-112 closes, LD orifice isolations close, all PRZ heaters off)
  5. PRZ Level Rises (min. charging, no letdown)
  6. 2/3 92% Rx Trip
132
Q

What do TS say about bypassing bistables?

A

ONLY one bistable is allowed to be bypassed at a time, unless performing surveillance testing

133
Q

What happens if CRID 2 is lost?

A

FRV-230 fails to auto. CH 2 FF/SF Fails and can’t take manual control

134
Q

What should be done if the RCS leak rate is > 150 gpm in mode 4?

A

Go to Mode 4 LOCA

135
Q

There is a common alarm for the pump and motor bearings for the RCP Bearing Temp High. What are the alarm setpoints

A

Pump Bearing - 175*F

Motor Bearing - 185*F

136
Q

CCP Recic valve QMO-225 (East) is controlled by _____

A

NPP-151

137
Q

How is leaking in-core detector thimble tubes classified?

A

pressure boundary leakage

138
Q

What do rods do if MPC-253 fails high?

A

rods step out

139
Q

The MFP will only switch to speed control and go to max speed during a runback if:

A

power is greater than 60%

140
Q

Will cross-tying sfp prevent boiling?

A

3” x-tie will NOT prevent boiling, only extend the time for boiling to occur

141
Q

How does a failure of MPC-254 affect rods?

A

It does NOT affect rods

142
Q

If frequency reaches 58.2 Hz and the Reactor is tripped, what is the status of the RCPs?

A

Remain running

143
Q

How does one of a Steam Generator Stop Valve’s associated dump valves are out of service affect operability?

A

The SGSV is Inoperable

144
Q

If the RCP Seal # 1 Outlet Temp Alarm is NOT lit, what is the natural circ cooldown limit?

A

Seals are good

Cooldown at less than 20*F/hr

145
Q

What issues can the RO use IFR-001 for?

A
PRZ Pressure
PRZ Level
VCT Level
LD Temp/Press
Unexpected Rod Motion
Unexpected Operation of Steam Dumps
146
Q

What signal is designed to trip the reactor to prevent exceeding DNB Limits?

A

Over Temperature Delta T

147
Q

Negative reactivity being added to the core can be seen by:

A

a lower Tave

148
Q

What do you do if there is unexpected operation of steam dumps?

A

If open due to control failure, place selector switches to OFF

149
Q

If a feed water flow instrument fails, how does it affect AMSAC?

A

AMSAC is disabled bc FW Flow feeds into AMSAC

150
Q

If there is a dropped rod, what must be done within 1 hour?

A

SDM must be verified

151
Q

What happens if PRZ Level control channel fails low?

A
  1. QRV-251 Opens
  2. Letdown isolates (QRV-112 closes, LD orifice isolations close)
  3. PRZ Heaters Trip Off
  4. PRZ Level Rises
  5. 2/3 92% Rx Trip
152
Q

Per TS, if a leaky PRZ PORV is capable of manually being cycled, you have…

A

1 hour to close and maintain power on block valve.

153
Q

What happens if the PRZ ref leg develops a leak on the controlling channel?

A

that channel’s level will rise and actual level will go down due to QRV-251 closing

154
Q

What must be verified within 1 hour of declaring PRZ pressure channel inoperable?

A

P-11 Status

155
Q

If a BAT pump trips, which valves close to stop makeup?

A

QRV-400, Blender to CCP Suction

QRV-451, Blender to VCT

156
Q

What are the various Reactor Trips for RCS Flow Instrumentation Malfunctions based on the different power levels?

A

< P7, NO TRIP

> P8, 2/3 on 1 loop < 91%

Between P7 and P8, 2/3 on 2 loops < 91%

157
Q

What must be verified within 1 hours of a Turbine Impulse Pressure Malfunction?

A

P-13 verified in correct state

158
Q

What do you do if you have a SR NI Malfunction in Mode 1?

A

Remove instrument power fuses and exit procedure.

159
Q

Per the rapid power reduction foldout page, You trip the Rx ad go to E-0 if…

A

Tave-Tref cannot be maintained within 5 degrees, what do you do?

Power reduction is uncontrolled
> 10% / min load reduction rate
And Tave < 541 or > 579

160
Q

What’s the risk of having the west CCP in service?

A

Potential for boric acid hideout in suction of the east CCP which could cause a reactivity event later on.

161
Q

During a loss of load < P8, what is the risk of rods remaining in Auto?

A

Rods will drive temperature down to 547 and out of the power range

162
Q

If there is a fuel handling accident in the Spent Fuel storage area, what are 2 local actions?

A
  1. Close crane bay roll up door

2. Close airlocks if refueling is in progress.

163
Q

If AFD is outside of the acceptable region, what do you do?

A

Lower power to < 50% within 30 mins.

164
Q

What auto-starts the standby bus duct fan?

A

Low Flow - 5” water