MT Ctrls Flashcards

1
Q

What is IOPS powered by?

A

CRIDS I, II, III

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does IOPS do?

A
  • Backup Overspeed protection at 110% (Hardwire trip)
  • Its energize to trip (2/3) passive probes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the DCS power supply?

A

BOP Battery System (250 VDC) thru inverter

- BLC/CLC backup to inverters **

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the DCS purpose?

A

Supply hydraulic fluid (motive force) for stop/control valve operation during normal and emergency conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does hood spray protect against?

A

Prevents LPT blade overheating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How fast do 10% and 20% manual runbacks go?

A

100 MW/min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When is a loss of a MFP runback enabled?

A

Unit 1 = 54.5%
Unit 2 = 60%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When a MFP is lost, how far do the main turbines runback?

A

Unit 1= 625 MW
Unit 2 = 752 MW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What will the Load Target be for an Over Power Delta Temperature and Over Temperature Delta Temperature Runback be?

A
  • Target Load to 30 MW
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When is power load unbalance armed?

A

Armed when 1st Stage Press > 40% (from DCS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the Main Turbine Load Reference for a power load unbalance?

A

Load Ref to 30 MW Mw/min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does the Droop Speed override signal do?

A
  • Biases Load Ref signal which closes down on control valves and Intermediate Valves
  • Protects from overspeed condition with output breaker closed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When is the Droop Speed override signal active?

A

> 1805 rpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the primary tripping device of the Main Turbine?

A
  • Trip Block Assembly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the one turbine trip input from TSI?

A

Thrust Bearing position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Will a failure of all 3 PLC speed sensors on the Turbine give you a turbine trip while on the grid?

A

NO!! Only if you’re NOT paralleled.

17
Q

What is the load target for an ATWS runback?

A

1 MW

18
Q

What is the purpose of Power Load Unbalance?

A
  • Provides overspeed protection in the event of a large load rejection
  • Used only on ATWS when the MT also fails to trip with manual AMSAC or Solenoid Trip
19
Q

Which valves will reposition when resetting the Main Turbine?

A

The Reheat Valves open

20
Q

What do the combined stop and intercept valves do for the turbine?

A

protect against overspeed of the turbine from residual steam from the MSRs on a turbine trip

21
Q

If moving the turbine in MW Control IN, what happens?

A

Load reference will ramp toward the Load Target and the PLC sends a signal to the control valves to match Load Reference.

22
Q

When in MW control IN, what happens when lake temperature moves around?

A

Valves will move around to maintain a constant MW value

23
Q

When in MW control OUT, what happens when lake temperature moves around?

A

Valve position stays constant, but MWs will move around

24
Q

What is unique to the Power Load Unbalance Runback?

A

Forced to MW OUT. All other Runbacks are forced to MW IN

25
Q

What kind of probes does IOPS use?

A

passive probes

26
Q

With regards to the solenoids for the Trip Block assembly, the MT will trip when how many solenoids do what?

A

2/3 de-energize

27
Q

When an operator places MT DCS to MW IN, the values for the Load Target, Actual Load and Load Reference will go to what value?

A

the MW value of the Actual Load

28
Q

The power load unbalance system is armbed above ____% and looks for a large rate of change in generator ____ per second

A

40% and amps

29
Q

When is turbine warming required for Unit 1? And what is used?

A

Chest warming required < 460ºF
Shell warming required < 250ºF

Utilize SV2