ECCS Flashcards
What are the ECCS Injection order with pressures?
- CCP 2600#
- SI Pumps 1560#
- Accumulators 600#
- RHR Pumps 210#
What is the ECCS Acceptance Criteria per 10CFR50.46?
- Peak clad temp < 2200°F
- Max cladding oxidation < 17%
- H2 concentration < 1%
- Core maintains cool able geometry
- Long term cooling provided
When does the ECCS injection phase end?
When RWST reaches low level (20%) and transfer to Recirc Sump
What is the RWST Tech Spec Limit?
- 375,500 gallons
- 2400-2600 ppm boron
- 70-100°F
When are the accumulators outlet valves open and deenergized?
Modes 1and 2
Mode 3 when Pzr # > 1000#
When do the accumulator outlets get an open signal?
SI sends signal to open outlet valves (IMO-110 thru IMO-140) to ensure any close valves will open
How many accumulators are necessary to inject into the core? (FSAR Assumption)?
3 accumulators contain enough borated water to fill volume outside of the reactor core barrel, below nozzles, bottom plenum, and portion of the core
Assumes one falls to the floor
What is the runout flow of the SI Pump?
700 gpm
What is the normal position of IMO-262 and IMO-263 (SI Pump to RWST recirc valves)?
OPEN for standby readiness (for injection phase)
When would you close IMO-262 and IMO-263 (SI Pump to RWST recirc valves)?
Closed for cold leg recirc to prevent pumping recirc sump to RWST
When are IMO-270 and IMO-275 (SI train x-tires) open and when are they closed?
- Normally open for standby readiness to provide 4 loop injection on 1 SI Pump failure
- Closed during hot lleg recirc to prevent loss of both trains from single passive failure of SI pump discharge piping
What will give you an SI signal?
- Pzr # Low - 1775# (2/3)
- Containment # High - 1.0# (2/3)
- S/G # Low - 500# (1/1 on 2 S/G)
- 1 S/G 100# ΔP lower than 2 others (2/3)
What is the Tech Spec Basis for the RWST Level?
Level 375,500 gal - min level for recirc sump
When do you align Hot Leg Recirc?
between 5.5 - 7.5 hrs after the LOCA.
What is the reason for the time limitations associated with Hot Leg Recirc?
- Waiting at least 5.5 hours avoids core uncovery due to boil off. Enough decay heat has been removed
- Not exceeding 7.5 hours prevent boron precipitation in the reactor