RMS Flashcards

1
Q

What happens on a High Rad of RRC-330 (SFP Area Rad Monitor)?

A
  • Trips AFS Fans (all 4)
  • AFX to Charcoal Mode
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What happens on a high rad signal of CRA-415/425 (CCW Rad Monitor)?

A

Closes CRV-412, CCW Surge Tank Vent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What happens on a high rad signal to DRA-300, Blowdown Rad Monitor?

A
  • Closes BD DCRs
  • Closes BD sample DCRs
  • Closes DRV-350
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What happens on a high rad to RRS-1001 (Liquid Effluent)?

A
  • Closes 12-RRV-285
  • MT Pumps Trip
  • WECT Pumps Trip
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What could a high rad alarm on the SJA or GSLO Rad Monitors (1800/2800 or 1900/2900) tell you?

A

A high alarm means either unit could have a SGTR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What happens on a high radiation alarm on VRS-1100(2100) (Upper Containment, Train A) and ERS-1300(2300) (Lower Containment, Train A)?

A
  • Closes VCR-101-107 (inside ctmnt valves)
  • Trips CIPS Fan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What happens on a high radiation alarm on VRS-1200(2200) (Upper Containment, Train B) and ERS-1400(2400) (Lower Containment, Train B)?

A
  • Closes VCR-201-207 (outside ctmnt valves)
  • Trips:
    - CIPX Fan
    - CPS/CPX Fan
    - CPR Fan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What happens on a high radiation alarm on the Vent Effluent Rad Monitor (1500/2500)?

A

Closes 12-RRV-306

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What happens on a high radiation alarm on ERS-7401(8401) (CR Area)?

A
  • Starts same Unit CREV
  • Closes ACRDA 1/1A
  • Part Opens ACRDA-2 or
  • Opens ACRDA-3A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which one of the following is NOT an automatic action that occurs if there is a high rad on the Spent Fuel Pit Area Monitor, RRC-330 alarms?

a. SFP Area Supply Fan AFS-3 trips.

b. SFP Area Exhaust Fan AFX-2 trips.

c. SFP Area Exhaust Charcoal Outlet Dampers opens.

d. SFP Area Exhaust Charcoal Filter Bypass Dampers close.

A

B. SFP Area Exhaust Fan AFX-2 trips

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

While adjusting the setpoint for SG Blowdown Radiation Monitor, DRA-300, a spurious high radiation alarm occured. Which set of responses contain the items automatically tripped/closed for this condition?

1) SGBD treatment pump.
2) SGBD sample isolation valves (DCR-301 to 304).
3) SGBD line isolation valves (DCR-310 to 340).
4) DRV-352 SGBD Treatment Heat Exchanger Outlet Valve.
5) DRV-350 SGBD Flash Tank to Turbine Room Sump Control Valve.

A. 1, 3, 5

B. 2, 3, 4

C. 2, 3, 5

D. 1, 2, 4

A

C. 2, 3, 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Following an external failure alarm on ERS-1300, Lower Containment Radiation Monitor, the containment ventilation system would respond by…

a. closing containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.

b. closing containment ventilation isolation valves VCR-101 to 107, VCR-201 to 207 and tripping HV-CIPS-1, HV-CPS-1/2, CPX-1/2, CPR-1, and CIPS-1.

c. opening containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.

d. opening containment ventilation isolation valves VCR-101 to 107, VCR-201 to 207 and tripping HV-CIPS-1, HV-CPS-1/2, CPX-1/2, CPR-1 and CIPS-1.

A

A. Closing containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which ONE of the following will result in the generation of a Containment Ventilation Isolation (CVI) signal on a HIGH Alarm?

A. Upper containment area radiation monitors, VRS-1101/1201
B. Unit vent effluent high range noble gas radiation monitor, VRS-1509
C. Lower Containment high range area monitors, VRA-1310/1410
D. Unit vent effluent low range noble gas radiation monitor, VRS-1505

A

A. Upper containment area radiation monitors, VRS-1101/1201

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In preparation for a Unit 1 Containment Pressure Relief, the BOP operator is directed to initiate a Source Check for Channel ERS-1305.
Fifteen seconds later the Unit Supervisor notes that the indication for Monitor ERS-1300 on the Unit 1 Composite display has turned WHITE.
Which ONE of the following explains the reason for this indication (WHITE status)? (Assume all other channels/monitors are functioning properly)

A. Source Check has been successfully completed.
B. Source check has been initiated and is still in progress.
C. The ALERT setpoint has been exceeded for the monitor during the source check.
D. The monitor Trip/Block switches are still in the BLOCK position.

A

B. Source check has been initiated and is still in progress.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which one of the following correctly describes the arrangement and location of the
Unit 1 Steam Generator PORV Monitors (MRA-1600 and MRA-1700)?

Two Radiation Monitors with a total of ______ detectors accurately monitor the secondary radiation levels _____.

A. 4, only when the associated SG PORVs are Open or Throttled.

B. 4, regardless of the position of the associated SG PORVs.

C. 2, only when the associated SG PORVs are Open or Throttled.

D. 2, regardless of the position of the associated SG PORVs.

A

A. 4, only when the associated SG PORVs are Open or Throttled.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What happens on a high rad signal to DRA-353, Blowdown Treament Rad Monitor?

A
  • Closes BD DCRs
  • Closes BD sample DCRs
  • Closes DRV-350
  • Trips BD treatment pump
17
Q

What is the SJAE Rad Monitor (1800/1900) looking at?

A

Which ever unit is suppying the 150 psig aux steam

18
Q

What is the GSLO Rad Monitor (1900/2900) looking at?

A

Which ever unit is supplying 50 psig aux steam for steam seals

19
Q

Which channels on the upper containment radiation monitors will cause auto actions?

A

Only Channel 1

Particulate

20
Q

Which channels on the lower containment radiation monitors will cause auto actions?

A

Channels 1, 3 and 5

(Particulate, Iodine and Normal Range Noble Gas)

21
Q

What happens when the radiation level on the Vent Effluent Rad Monitor (1500/2500) reaches the high high setpoint for channel 5?

A

VRV-318 Closes and VRV-317 Opens, aligning the accident flowpath

Changes back if falls below setpoint