What happens on a High Rad of RRC-330 (SFP Area Rad Monitor)?
- Trips AFS Fans (all 4)
- AFX to Charcoal Mode
What happens on a high rad signal of CRA-415/425 (CCW Rad Monitor)?
Closes CRV-412, CCW Surge Tank Vent
What happens on a high rad signal to DRA-300, Blowdown Rad Monitor?
- Closes BD DCRs
- Closes BD sample DCRs
- Closes DRV-350
What happens on a high rad to RRS-1001 (Liquid Effluent)?
- Closes 12-RRV-285
- MT Pumps Trip
- WECT Pumps Trip
What could a high rad alarm on the SJA or GSLO Rad Monitors (1800/2800 or 1900/2900) tell you?
A high alarm means either unit could have a SGTR
What happens on a high radiation alarm on VRS-1100(2100) (Upper Containment, Train A) and ERS-1300(2300) (Lower Containment, Train A)?
- Closes VCR-101-107 (inside ctmnt valves)
- Trips CIPS Fan
What happens on a high radiation alarm on VRS-1200(2200) (Upper Containment, Train B) and ERS-1400(2400) (Lower Containment, Train B)?
- Closes VCR-201-207 (outside ctmnt valves)
- Trips:
- CIPX Fan
- CPS/CPX Fan
- CPR Fan
What happens on a high radiation alarm on the Vent Effluent Rad Monitor (1500/2500)?
Closes 12-RRV-306
What happens on a high radiation alarm on ERS-7401(8401) (CR Area)?
- Starts same Unit CREV
- Closes ACRDA 1/1A
- Part Opens ACRDA-2 or
- Opens ACRDA-3A
Which one of the following is NOT an automatic action that occurs if there is a high rad on the Spent Fuel Pit Area Monitor, RRC-330 alarms?
a. SFP Area Supply Fan AFS-3 trips.
b. SFP Area Exhaust Fan AFX-2 trips.
c. SFP Area Exhaust Charcoal Outlet Dampers opens.
d. SFP Area Exhaust Charcoal Filter Bypass Dampers close.
B. SFP Area Exhaust Fan AFX-2 trips
While adjusting the setpoint for SG Blowdown Radiation Monitor, DRA-300, a spurious high radiation alarm occured. Which set of responses contain the items automatically tripped/closed for this condition?
1) SGBD treatment pump.
2) SGBD sample isolation valves (DCR-301 to 304).
3) SGBD line isolation valves (DCR-310 to 340).
4) DRV-352 SGBD Treatment Heat Exchanger Outlet Valve.
5) DRV-350 SGBD Flash Tank to Turbine Room Sump Control Valve.
A. 1, 3, 5
B. 2, 3, 4
C. 2, 3, 5
D. 1, 2, 4
C. 2, 3, 5
Following an external failure alarm on ERS-1300, Lower Containment Radiation Monitor, the containment ventilation system would respond by…
a. closing containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.
b. closing containment ventilation isolation valves VCR-101 to 107, VCR-201 to 207 and tripping HV-CIPS-1, HV-CPS-1/2, CPX-1/2, CPR-1, and CIPS-1.
c. opening containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.
d. opening containment ventilation isolation valves VCR-101 to 107, VCR-201 to 207 and tripping HV-CIPS-1, HV-CPS-1/2, CPX-1/2, CPR-1 and CIPS-1.
A. Closing containment ventilation isolation valves VCR-101 to 107 and tripping HV-CIPS-1.
Which ONE of the following will result in the generation of a Containment Ventilation Isolation (CVI) signal on a HIGH Alarm?
A. Upper containment area radiation monitors, VRS-1101/1201
B. Unit vent effluent high range noble gas radiation monitor, VRS-1509
C. Lower Containment high range area monitors, VRA-1310/1410
D. Unit vent effluent low range noble gas radiation monitor, VRS-1505
A. Upper containment area radiation monitors, VRS-1101/1201
In preparation for a Unit 1 Containment Pressure Relief, the BOP operator is directed to initiate a Source Check for Channel ERS-1305.
Fifteen seconds later the Unit Supervisor notes that the indication for Monitor ERS-1300 on the Unit 1 Composite display has turned WHITE.
Which ONE of the following explains the reason for this indication (WHITE status)? (Assume all other channels/monitors are functioning properly)
A. Source Check has been successfully completed.
B. Source check has been initiated and is still in progress.
C. The ALERT setpoint has been exceeded for the monitor during the source check.
D. The monitor Trip/Block switches are still in the BLOCK position.
B. Source check has been initiated and is still in progress.
Which one of the following correctly describes the arrangement and location of the
Unit 1 Steam Generator PORV Monitors (MRA-1600 and MRA-1700)?
Two Radiation Monitors with a total of ______ detectors accurately monitor the secondary radiation levels _____.
A. 4, only when the associated SG PORVs are Open or Throttled.
B. 4, regardless of the position of the associated SG PORVs.
C. 2, only when the associated SG PORVs are Open or Throttled.
D. 2, regardless of the position of the associated SG PORVs.
A. 4, only when the associated SG PORVs are Open or Throttled.