Well and Demin Flashcards

1
Q

What are the Three main water storage systems at Dresden?

A

Well Water, Condensate Transfer, Clean Demin

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the purpose of well water?

A

Provides water to the domestic water and makeup demin systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the purpose of the condensate transfer system?

A

Provides grade demineralized water, which has been tilized int he Rx/Turbine cycle and is potentially contaminate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the purpose of Clean Demin System?

A

Provides Rx grade demin water from MUDS which has never been through Rx/Turbine cycle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many deep well pumps are there?

A

2 - located north and south of the main parking lot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How large is the Well Water Tank?

A

200,000 gallons

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the high and low level limits of the well water tank and what are the actions at these levels?

A
Low level (15ft) - well pumps start
High level (28.5ft) - Well pump stop and initiates 2 minute timer to prevent restarting pump
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the power sources for the deepwell pumps?

A

North - PC-7A; South - PC 4A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is used to transfer water from the well water tanks?

Setpoints?

A

Domestic water pumps transfer water from the well tanks to the domestic water accumulators.
At 38psig in domestic water accumulator - first pump starts
At 36psig in domestic water accumulator - second pump starts
Pumps stop at level of 31” and air blank makes up pressure to 48psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where is level of the well water tank indicated?

A

2/3 MUDS CR and MCR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How many well transfer pumps are there and what do they do?

A

3 - transfer to MUDS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How is level in the domestic water accumulator controlled?

A

makeup water from well tank.
controlls on Low pressure and HI level
First Pump Starts at 38psig; Second pump starts at 36psig;
Pumps stop at 31”; U1 IA controls air blanket at 48psig to maintain system pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the purpose of the Condensate Transfer System?

A

To store and pump contaminated demineralized water to the main condenser hotewell and various plat systems as MAKEUP and to supply dedicated amount of water for normal HPCI suction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the minimum TS level for the CST?

A

140000 gal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How many contaminated Demin Tanks are there?

A

3 TOTAL
2 - 2/3A and 2/3 B
1 - U1 Contaminated DEMIN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How do the CST’s ENSURE capacity for HPCI Suction?

A

Standpipe in 2/3 CSTs are located at 90,000 gallon level.
Everything except HPCI and condensate transfer suction off standpipe to ensure there is a minimum amount dedicated to HPCI.

17
Q

What takes suction off the bottom level of the CST Tanks?

A

HPCI and Condensate Transfer

18
Q

Where do the CST overflows drain to?

A

One on each tank - any water from the site glassed overflow lines drain to the U2 Turbine Building EQUIPMENT DRAIN SUMP.

19
Q

Where are the CST Overflow line site glasses located?

A

Located between floors, south of the stair landing between U2 H2 seal oil unit elevation and the ground floor

20
Q

What powers the Condensate Transfer and Jockey pumps?

A

2A Cond. Transfer and Jockey Pump - MCC 28-2

2B Cond. Transfer Pp - MCC 29-2

21
Q

How do the CST Immersion Heaters control tank tem?

A

1A - cycles to maintain above 35F

2/3 - cycle to maintain temp above 42F - NO CONTROL SWITCH

22
Q

How is Hotwell Make-up supplied from the CSTs?

A

Normally water is VACUUM DRAGGED to condenser through AOV.
Both Pumps auto start if Emergency Makeup AOV goes FULL OPEN
(Open Limit Switch)

23
Q

Where do the Hotwell Make-up Pumps route to/from adn what are their power source?

A

from CSTs to Hotwell - BOTH POWERED FROM MCC 26-1

24
Q

What are the MAJOR COnd. Transfer Loads?

A

LPCI/CS Back-up Keep-fill
HPCI Keep Fill (gravity)
RWCU System Demin
IC shell make-up (last Resort)
Fuel Pool system and skimmer surge make-up
SJAE, Gland Seal and Condensate loop seal fill
Cond. Demin, Condensate Transfer water and sonic cleaner
2/3 Radwaste

25
Q

What is the Clean Demin Water System?

A

Stores clean RX GRADE demin water processed from MUDS

26
Q

Where is Clean Demin Water Stored?

A

U1B Tank - 200,000gallon tank. - Heater keeps temp above 35F

27
Q

What powers the Clean Demin Pumps?

A

MCC 25-2 (ONLY ON U2)

28
Q

What is Clean Demin supplied to?

A
RBCCW and TBCCW head tanks
Main Cond. Vac Pumps
Filter Building
Off-Gas Inst.
Recomb Rooms
SWC
CREVS
IC NORMAL MAKEUP
SBLC
RW
Service STations