Waste Water Treatment Flashcards

1
Q

What is the purpose of the Waste Water Treatment SYstem?

A

Process NON-RADIOACTIVE WASTE STREAMS to remove OIL, GREASE, and SOLIDS prior to discharge to ILLINOIS RIVER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are teh general processes used by WWT?

A

Equalization, Flocculation, Sedimentation, Filtration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the collection points for plant water that will be routed to WWT?

A

U2 Ejector Station
U2/3 Ejector Station
U3 Ejector Station
U2/3 CH Sump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the inputs to the U2 Ejector StatIon? - where does it go?

A

Non-contaminated floor drains of U2

Goes to U1 Oil Separator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the inputs to the 2/3 Ejector STation?

Where does it route to?

A

U3 roof drains, U2 EHC Non-Contaminated flood rains, and Turbine Oil Tank room floor drains
Routes to 2/3 Oil Separator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the inputs to the U3 Ejector STation?

Where does it route to?

A

Inputs are Non-contaminated floor drains of U3.

Routes to 2/3 Oil Separator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the input fro the 2/3 CH Sump?

Where does it route to?

A

Input from drainage of 2/3 CH

Routes DIRECTRLY to WWT Equalization tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the inputs of the U1 Oil Separator?

Where does it route?

A
U1 Non Rad Floor Drains
SBO Building Drains
CHem Cleaning Rain Drains
Discharge of U2 Ejector STation
Sumps transfer to WWT Equalization Tank
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What inputs to the 2/3 Oil Separator?

Where does it route?

A

Takes input from 2/3 Ejector station, and U3 ejector station

Sumps route separator to WWT Equalization Tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the General Flow Path in the WWT building?

A

Equalization Tank - Oil Skimmer (IN Tank) - Equalization Tank Transfer Pumps - Splitter Box 1 - Flocculator/Clarifier - Splitter Box 2 - Gravity Sand Filter - Clearwell - Sludge Drying Beds - Discharge to ILLINOIS RIVER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What exists in the Equalization tank to separate oil skimmer from teh rest of the tank?

A

The tank is split by a baffle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is flocculation?

A

Gathering of particles by addition of compound for adherence to form larger masses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is added to aid in flocculation?

A

ALUM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is Equalization?

A

Collection and storage of inputs prior to processing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is sedimentation?

A

Settling out of large particles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is Filtration?

A

Filtering to remove suspended solids

17
Q

What are the two sections of the large above ground WWT tanks called?

A

Flocculator - inner

Clarifier - outer

18
Q

What is used in the Gravity Sand Filter as filter media?

A

2 feet anthracite coal and 12 inches of sand

19
Q

WHat is used to backwas the filter system?

A

Filter backwash pumps are in the clearwell and use the clearwell water to backwash sand filter

20
Q

What exists in the WWT system to ensure that the water is okay for discharge?

A

Composite sampler

21
Q

How many sludge drying beds are there?

A

5

22
Q

What is the purpose of the chemical feed system?

A

This is the alum addition system - aids in flocculation - auto system available although doesn’t currently work. Feeds Alum into splitter Box 1

23
Q

How does Instrument Air support WWT?

A

Supplies for operating pneutmatic equipment - compressors, dryers, and controls are in the building

24
Q

What is the WWT Hydropneumatic system for?

A

Located on the mezz level above WWT Control panel

Uses well water from well water tank gravty flows.

25
Q

What feeds WWT components power?

A

MCC 20-7 and 30-6