125vdc Flashcards

1
Q

Where is the U2 125vdc battery?

A

TB 549 (above MCR)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where is the U3 125vdc Battery?

A

Upper level battery room above U3TB 538.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where is the U2 125vdc alt battery

A

SBO building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What powers the 2(3) 125vdc battery Charger?

A

MCC 29-2(39-2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What Powers the 2(3)A 125vdc Charger?

A

MCC 28-2(38-2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What powers the U2 125vdc alt battery charger?

A

MCC 65-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What timeframe load is the 125vdc designed to handle?

A

Start and handle normal DC and all SSD DC loads on one unit AND
Operations to limit consequences of design basis event on other unit for 4 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the purpose of 125vdc dist. system?

A

Provides reliable DC power to operate equipment such as solenoid valves, logic systems (PCIS & ECCS), and circuit breaker power for 4kV and 480V buses.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the normal mode of operation for the 125vdc battery chargers?

A

Float

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What provides Div I 125vdc normally?

A

The Unit 125vdc battery charger

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What supplies the Div II 125vdc loads?

A

Opposite Unit 125vdc battery system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

During normal operations, what normally provides the power source for 125vdc loads?

A

Unit 125vdc battery chargers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Why is the Unit 2 125vdc alt battery larger than the U3 battery?

A

Sized larger because of the larger losses from longer cable runs to go from SBO to Power block.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the U3 125vdc alt battery charger power source (normally)?

A

MCC 35-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the purpose of the battery chargers?

A

The battery chargers provide the normal 125vdc power, and keep batteries fully charged in float pmode.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What supplies the main 125vdc power to the Unit Div. I RB Loads?

A

RB Distribution Panel

17
Q

What supplies normal power to 125vdc Reserve Bus 2(3)?

A

Main Bus 3A (Main Bus 2A-1)

18
Q

What is a Level 2 Ground?

A

Requires Immediate immediate ground checking and IR
125vdc : <125kOhm (to ground) (>70v w/no buttons or >90 v w/either button)
250vdc : >183.6v with no buttons or > 215.5v w/either buttons

19
Q

What is a Level 3 Ground?

A

14days to find and notify distribution operator:
125vdc: <20kOhm (>115v w/no buttons or >120 v with either button)
250vdc: >229.4 v w/no buttons or >244.1v w/either button
(A+B = C : Positive button + negative button = no button)

20
Q

How are battery voltages displayed in MCR?

A

6 position switch on 902-8 panel

* THERE IS AN AMMETER ON BATTERY DISCHARGE THAT COULD CAUSE 902(3)-8 F-9 “250V-125V 24/48V BATT DISCHARGE HI” alarm*

21
Q

What loads are lost upon loss of U2 125vdc Reactor Building Distribution Panel Loss?

A

Control Power for 23-1 & 28
RB Vent Dampers Close
2/3 EDG control power transfer to U2 RB Bus
IsoCondenser Isolates

22
Q

What happens with loss of Main Bus 2A-1?

A

U2 RB Bus lost
Lose control power to 23 and 36
RFP and Cond. Pps auto start disabled.
All RFP trip relays disabled (continue to run)
HPCI logic alternate disabled
CS & LPCI Div I logic lost
ADS Div I logic lost
All ADS valve solenoids transfer to alternat feed lost
ISCO logic lost - causes ISCO isolation
MCR indication of inboard MSIVs lost
Loss of U3 Reserve Bus 3B-1 and all loads

23
Q

What happens if the feed to Bus 2A-1 loads lost?

A
Breaker Control for Bus 21 and 25 lost
various panels (Gen backup relay, EHC, Voltage Reulation exciter, annunciator panel 902-34, H2 and Stator Water Cooling Panel)
24
Q

What happens with loss of 2B-1 Bus?

A
Loss of Control to Bus 24, 24-1, and 29
U2 EDG control Power lost
ATWS 70B Inverter supply lost
Div II LPCI and CS logic
ADS Div II logic
HPCI logic normal feed
MCR indication for outboard MSIV