5.6 Control Scope (Scope MGMT) Flashcards
What is 5.6 Control Scope?
- The process of monitoring the status of the PROJECT and PRODUCT scope
- Managing changes to the scope baseline
What is the key benefit of 5.6 Control Scope?
The scope baseline is maintained throughout the project
When is 5.6 Control Scope performed in the project?
Throughout
5.6 control scope - inputs
- project management plan (6)
- project documents (3)
- work performance data
- organization process assets
what project management plan elements are inputs to 5.6 control scope?
a. scope management plan
b. requirements management plan
c. change management plan
d. configuration management plan
e. scope baseline
f. performance measurements baseline
what project document elements are inputs to 5.6 control scope?
a. lessons learned register
b. requirements documentation
c. requirements traceability matrix
5.6 control scope - tools and techniques
- data analysis
what data analysis tools and techniques are relevant to 5.6 control scope?
a. variance analysis
b. trend analysis
what is variance analysis?
- used to compare the baseline to the actual results
2. determine if variance is within the threshold amount or if corrective/preventive action is appropriate
what is trend analysis?
- examines project performance over time
2. determine if it is improving or deteriorating
5.6 control scope - outputs
- work performance information
- change requests
- project management plan updates (5)
- project document updates (3)
what project management plan updates are relevant outputs to 5.6 control scope?
a. scope management plan
b. scope baseline
c. schedule baseline
d. cost baseline
e. performance measurement baseline
what project document updates are relevant outputs to 5.6 control scope?
a. lessons learned register
b. requirements documentation
c. requirements traceability matrix
what is work performance information?
correlated and contextualized information on how the project and product scope are performing compared to the scope baseline
what requires change requests in 5.6 control scope?
changes to the scope and schedule baselines or other components of the project management plan