Security and Environmental(NSO-4) Flashcards

1
Q

What are the required actions if you suspect sabotage in accordance with AD-SY-ALL-0250?

A
  1. Immediately report the issue/concern to Site Security.

2. Secure the scene(stop work) to ensure the evidence is not disturbed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What shouldn’t you do if sabotage is suspected in accordance with AD-SY-ALL-250?

A
  1. Do not disturb the scene unless directed to by Operations
  2. Do not confront an individual, just maintain observation.
  3. Do not touch or move a suspicious device.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who needs immediate notification of potential sabotage?

A

The Shift Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If sabotage cannot be quickly ruled out who will meet to determine if the act was deliberate?

A
  1. Shift Manager
  2. Shift Work Manager
  3. Security Captain
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In the case of confirmed sabotage who will determine the proper actions?

A

The Operations Manager or the Station Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What procedures cover suspected acts of sabotage?

A
  1. OMP 2-45

2. AD-SY-ALL-0250

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the purpose of the housekeeping and material condition procedure?

A

To provide for the continued safe and reliable operation of Duke Energy nuclear stations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which department owns material the material condition of the plant and plant equipment?

A

Operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the procedure that covers housekeeping and material condition?

A

NSD-104

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What procedure covers system leaks?

A

AD-MN-ALL-0006

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Who is responsible for initiating a Work Request upon discovery of a Boric Acid leak?

A

All personnel working at the site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who cleans up Boric Acid leakage?

A

Maintenance will perform the cleaning of boric acid crystal after performing actions to help facilitate boric acid corrosion evaluations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who maintains a database of all the Boric Acid leaks?

A

Maintenance maintains a list of active and inactive leaks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What procedure covers Foreign Material Exclusion?

A

AD-MN-ALL-0002

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the definition of Foreign Material?

A

Any material that is not part of a site SSC design, that if introduced could adversely affect the SSC design function or operability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the purpose of the FME program?

A

Establish processes, individual behaviors, and practices required to PREVENT Foreign Material Intrusion(FMI) events into site systems, structures, and components(SSCs)

17
Q

What are the required actions for a loss of FME control?

A
1. Immediately notify: 
  A. Supervisor 
  B. Operations Control Group(Control Room)
  C. Shift Manager 
  D. Department Duty Manager 
  E. FME Coordinator 
  1. The supervisor with engineering support will attempt to locate the material.
  2. The FME event or incident shall be documented in a NCR.
  3. Initiate work packages required for retrieval.
  4. If material cannot be retrieved, initiate a request for engineering to determine the effect on the system and alternate retrieval methods.
18
Q

What group is responsible for determining the effect of foreign material on a system?

A

Engineering