Plant Modifications and Tag Audits Flashcards

1
Q

What are Vital to Operations(VTO) Drawings/Documents?

A

Vital to Operations(VTO) drawings/documents are those deemed critical to support plant operations, maintenance, and testing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the VTO Drawings/Documents listed in OMP 2-10?

A
  1. Mechanical Flow Diagrams
  2. Electrical One-Line/Three-Line Drawings
  3. Electrical One-Line list for 600V Breakers
  4. Electrical Low Voltage Breaker List
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Where are the pending engineering change documents and drawings located in the Control Room?

A

Located at column CC-56 in the Control Room file cabinet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the purpose of a Safety Tag Audit?

A

A safety tag audit is a physical verification that the tags for clearances in effect greater than 30 days are in place and undamaged, and that components are in the position listed on the Tag List.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the frequency of Safety Tag Audits?

A
  1. Monthly
  2. Quarterly
  3. Yearly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is required if there are discrepancies found during a Safety Tag Audit?

A
  1. If a large number of discrepancies are found, the extent of the audit will be increased to provide assurance that remaining clearances are correct.
  2. Damaged, illegible, or missing tags shall be reprinted and replaced, then documented on the details tab.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the Test Method for verifying compliance with Plant Status Control?

A

The Test Method for verifying compliance with plant status control is to perform an audit of the Plant Status Control and Test Tags.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the frequency of Plant Status Control Audits?

A
  1. Monthly - checks any tags in effect greater than 30 days
  2. Quarterly - checks any tags in effect greater than 30 days and directs completion of a Quarterly Audit that is reviewed by the Shift Manager.
  3. Annually(4th Quarter) - Adds checks for components out of normal position greater than 1 year and determines if previous evaluation is valid.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is required if there are discrepancies found during the Plant Status Control Audits?

A
  1. Replace any Plant Status Control Tags that are found missing or damaged.
  2. If a component is found incorrectly positioned the Shift Manager shall be notified and proper paperwork completed prior to any repositioning.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When are Electrical Circuit Isolation Tags used?

A
  1. Electrical Isolation Tags are NOT utilized for personnel safety.
  2. Electrical Isolation Tags are used for isolations left unattended by the implementer.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are some examples of components that would have an Electrical Isolation Tag?

A
  1. Lifted Leads
  2. Open Sliding Links
  3. Removed Fuses or Plugs
  4. Installed Temporary Jumpers
  5. Open Knife Switches
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What color Electrical Isolation Tag is used by Operations and Maintenance?

A
  1. Operations - White Tags

2. Maintenance - Blue Tags

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Where are Electrical Isolation Tags used, and where are they not allowed?

A
  1. Electrical Isolation Tags are not used in the Containment.
  2. Electrical Isolation Tags are used in all other locations, including the Annulus.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the definition of Operational Control?

A

Having the authority and responsibility to position/reposition and tag site equipment or devices.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Where is Operational Responsibility designated for specific components?

A
  1. The Equipment Data Base

2. Attachment 1 of SD 3.1.36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who determines the boundaries for the Operational Control of systems?

A

Boundaries are established and agreed to by OPS Group and the Owner Control Group(OCG).