Ops Manual Smoke Alarm Program—2019 Flashcards
The Department will assign ______ “First Responder” Program Representatives, _____________?
Three, one per division
Program components:
The ______________ will track all materials distributed to the SDFD units and coordinate replenishment.
Burn institute
Smoke alarms and batteries will be stored and tracked at the ________________?
Office of the PIO
______________________will assist in the tracking and storing of supplies at the SDFD PIO Office.
SDFD Program coordinators
First responder crews should direct questions and issues regarding the First Responder Smoke Detector Program to _______________________?
Their division representative
Installation procedures:
Smoke detectors will be installed if a residence is without a working smoke detector in _________________________________?
each room used for sleeping purposes.
Smoke detectors will be installed on the _______ or ______ in the following areas:
Ceiling or wall
When can we be summoned to install a smoke alarm?
Upon request by the following:
Media spots
Community meetings
Burn Institute
Fire company assesses a residence and recognizes the need for a smoke detector or battery replacement
All requests for installation of smoke detectors will be coordinated through ___________________________?
The office of the PIO
The office of the PIO will then forward the smoke detector installation request to the ______________________________?
Community Risk Reduction Complaint Clerk. Formerly known as the Fire Prevention Bureau
Once received at the fire station, the ________________will be responsible to assign smoke detector installation requests to a division within the fire station.
Station captain
The assigned first responder unit shall respond to smoke detector installation requests within ___________ shifts of receipt
5
Crew should allow for a __________ window for installation purposes
Four - hour
If a smoke detector is replaced, the removed smoke detector should be forwarded to the __________________where it will be forwarded to the ______________________ for recycling
Office of the PIO
San Diego Burn Institute
After installation of any smoke detector, the first responder unit who performed the installation will be responsible to complete ____________________________________________?
an Installation / Liability Release form (FD-559).