What is the job of the LSM?
Reduce impact of 1500vdc to the overhead by switching off circuits to protect the substation overloading with power
At what motor alternator output voltage does the LSM activate during loss of overhead power and how long must that voltage be sustained?
95vDC for 2 seconds
How long is the time delay on each LSM once the BVIC is closed?
4 minutes
What is the LSM speed threshold?
Below or above 8km/h
With the BVIC open, what will the LSM do under 8km/h with the loss of overhead power on a motor car?
Bring the train to a stand and ensure leading Pantographs remain up but drop the trailing Pantographs
Ensure leading MA contactors stay closed
Trailing MA contactors open
What can cause a loss of overhead power?
Weak substation output or failure
Overhead failure
Defective 1500vdc circuits
How long after loss of overhead power will the vicers activation relay exhaust brake pipe to atmosphere?
5 minutes
How do you reset an over speeding GEC MA?
Hit the button with a switch stick
How many times will Electrol attempt to reset the overhead system in the case of failure?
Twice
After startup without communication and after loss of overhead, how long must an up train wait to move?
30 seconds
After startup with no communications and after loss of overhead, how long must a down train wait to move?
60 seconds
After a restoration of overhead power without communication, what notch must the driver drive in until the next station?
Series ensuring the amps on the ammeter drop below 100amps
How does train control locate a defective train overloading the overhead?
Asking each train one by one to raise their pantographs and start MAs
When a train overloads the system train control has identified the train
Once the train overloading the system has been identified, what will be asked of the driver?
Raise each panto and MA individually from each motor car until the defective equipment is identified
What percentage of operational motors will enable the train to operate over all system gradients?
50%