Ship Blackout Flashcards
1
Q
Em gen doesn’t start, procedure for paralleling generators manually?
A
- Carryout normal pre start checks
- Start up generator in manual and check
- Check the voltage of the incoming generator to confirm excitation. If not excitation then check AVR
- Check reverse power and overload trips are reset
Check the incoming machines frequency, this should be slightly higher - Switch on check synchroniser
- Switch on syncroscope
- Close the breaker when the incoming machine is at 10 to 12 on the syncroscope
- Once load has taken switch off syncroscope
- Balance the load
- Monitor both generator loads, pressures and temps