Q

The DOB is notified via the Boro Dispatcher in all but which situation? (2.1)a. Structural Collapseb. Suspected serious structural condition/problemc. Elevator incident w/ injd. Elevator incident- Serious (ex. free falls)e. Escalator incident w/ injf. Defective boiler/water heater w/ injg. Defective boiler/water heater- Serious (explosion)h. Amusement ride incidenti. Sidewalk shed incident (damage to shed)j. Scaffolding related incident (hanging or fixed)h. Construction site accident (crane accident, worker falls)

A

H. Amusement ride incident With Injuries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Public Service Commission requires utility companies to investigate which 2 types of events? (1.2)

A

Injuries/fatalities sustained from CO poisoning during an emergency in a building where natural gas may have been a contributing factor.Any fire/emergency where natural gas may have been a contributing factor.Officers will continue to notify utility companies whenever deemed necessary.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When making notification to the dispatcher following a 10-40-1, what information must you provide? (1.3)

A

Type and location of any gas valve shut down.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For incidents occurring in NYCHA buildings/facilities, who must be notified? (2.4)a. NYCHAb. D.O.B.c. bothd. neither

A

A. NYCHA DOB does not require notification of incidents occurring inside NYCHA buildings/facilities.