RowframeCellar FireFirst Line
- First line through the front door, then to the cellar via the interior stairs to extinguish the fire.2. If this line cannot be advanced down to the cellar due to the intensity of the fire, it shall be used to protect the public hall, interior stairs, and the first floor,3. The first line can be advanced to the top floor to cover any extension to that area or the cockloft after the cellar fire has been controlled by the second line.
RowframeCellar FireSecond Line
- If the first line has advanced into the cellar, the second line shall extinguish any fire on the first floor then proceed to the top floor as in above.2. If the first line is used to cover the public hall, etc., the second line will be stretched into the cellar VIA THE OUTSIDE cellar entrance to extinguish the fire.
RowframeCellar FireThird Line
The Incident Commander should order a third line stretched to the top floor of the fire building if units operating the first and second lines cannot complete their assignment.
RowframeFire on Upper FloorFirst Line
The first line should be stretched to the location of the fire via the interior stairs.This line will need to have sufficient length to cover the entire building.
RowframeFire on Upper FloorSecond Line
The line should be stretched to the top floor or to the floor above. If a fire is reported in the exposure, the second line may be more effective being stretched to the exposure, with the third or fourth line stretched to back up line #l.
RowframeFire on Upper FloorThird Line
- To the fire building.2. To exposure.3. To supply a tower ladder.4. Through an exposure to the rear yard.
RowframeBuilding Fully Involved and Fire in Exposures-Holding OperationFirst Line
When a building is fully involved with fire showing in exposure(s) the first arriving engine company should stretch one 3 ½” supply line for a tower ladder, and a handline for entering the building.
RowframeBuilding Fully Involved and Fire in Exposures-Holding OperationSecond Line
The second line is stretched to the top floor of the most severe exposure.
RowframeBuilding Fully Involved and Fire in Exposures-Holding OperationThird Line.
The third line is stretched to the top floor of the opposite exposure.
RowframeBuilding Fully Involved and Fire in Exposures-Holding OperationFourth Line
Stretched as ordered by the Incident Commander.
Vacant Buildings in a Row of Occupied FramesFirst Line
The first to arrive engine company should drop two lines: one a 3 ½” line to supply a TL, a handline to enter the most severe exposure.
Vacant Buildings in a Row of Occupied FramesSecond Line
Stretched to the fire building or to the opposite exposure.
Vacant Buildings in a Row of Occupied FramesThird Line
Stretched to the fire building or to the opposite exposure, depending on where the second line was stretched too.
Vacant Buildings in a Row of Occupied FramesFourth Line
As ordered by the Incident Commander.
Vacant Building(s) in a RowFirst Line
The first to arrive engine company stretches a 3 ½” hoseline to supply a TL, and stretches a handline for use on the exterior of the building.Initially operate from the exterior until the TL, or a heavy caliber stream can be placed into operation. The handline is then stretched into the most severe exposure.