Highlighted Admin Flashcards
Who is responsible for the ISFSI?
- Unit 1 SM
- Unit SM while dry cask in in transport (not set on pad)
What is minimum shift manning for a unit?
- 1 SM
- 1 CRS
- 2 RO’s
- 1 FTA for site
- 4 AO’s
- 1 RW for site
- 1 SBOG for site
- 1 outside area
- 3 STA or 2 STA and 1 ENS communicator
- 1 ENS communicator
- 2 STSC communicator for site
How many RO’s and AO’s are required to be within the unit at all times?
- 2 RO’s
- 3 AO’s
How long can a required manning position be vacant?
- Any position except SM
- < 2 hrs
- Unplanned incident (can’t be vacant just to go home)
How does MCR staffing requirements change in Mode 5-6?
- CRS normally has command function
- May be qualified SRO or RO
What do night orders provide?
- Info to ops in timely manner
- Temporary
- Shorter term than standing orders
What do Standing orders provide?
- Info for longer term issues
- OD contingency plans
- ODMI Action plans
- Directives from Ops Manager
How are alarms communicated?
- Directly to CRS
- Promptly identify cause
Which alarms CANNOT be left in fast flash?
- CEA position out of limits
- Possible inadvertent boron dilution
- CNTMT Sump excess leakage
When and how do you transition back to normal alarm response from transient alarm response?
- CRS directs
- Plant is stable
When is an alarm considered “expected”
ONLY if prebriefed
What actions are required if an alarm occurs do to an activity, but was not briefed?
- considered unexpected alarm
- ARP to validate no further actions
- ARP used at CRS discretion
Which alarms are NOT to be left in fast flash
- CEA out out-of-limits (PDIL)
- Possible Boron Dilution (BDAS)
- CTMT Sump excess leakage (RCS leak detection)
When do you transition from transient alarms back to normal?
- CRS directs
- plant is stable
When would you manually input a SESS?
- Disabled/ unable to perform function and NOT alarmed
- Impairment > 1 shift
Where do you document manual SESS inputs?
Unit Log
Does manually actuating a Rx trip or ESFAS actuation that did not auto occur required CRS concurrence?
NO
How often are critical parameters monitored?
- Every 5 minutes
Who CANNOT provide peer checks?
- SM
- CRS
- Rx manager
How are peer checks managed for AOP/EOP’s?
- Preferred
- NOT required
What is required to have Peer Checker also act as IV’er?
- SM permission
- CR documenting
What are some examples of 2-Handed ops?
- SG sample isolation vlvs
- RCP B/O isolations
- ADV’s
- HPSI injections
- SIAS/CIAS actuation
- etc.
True or False the Rx manager must have an active SRO license
TRUE
What notification is required for AOP/EOP entries?
- NRC Resident
What plant activities require a plant announcement?
- Brkr manips 4.16 & 13.8kv
- Starting large equipment
- Changing plant modes
Who determines equipment quarantine requirements?
- SM
What covers deviations from procedures and what is required to do so?
- 54(x) procedure, 1 hour notification
- 32(d) dry caks, 4 hour notification
- In an emergency
- Action IMMEDIATELY needed to protect public health and safety
What is required to maintain license?
- 5x 12 hour shifts in license position per quarter
- SRO’s need 1 of those as supervisory watch
- Complete requal in 6 weeks of end of training cycle
How are CR discrepancies identified?
- Red sticker dot
What is required to jumper a CR alarm?
How is that identified in the CR?
- Alarming for non-justifiable reason
- > 14 days
- Orange sticker dot
(Common unit alarms not jumpered)
When is a mode change checklist performed?
- Mode Changes
- Pressure ≥ 385 psia
- Pressure ≥ 1837 psia
- Closing RTCB’s
- Power > 15%
- Power > 20%
- Irradiated Fuel moves
What is the time requirement for Mode Change Checklists?
- Change performed with 24 hours of STARTING checklist
Who can extend a Mode Change Checklist?
- STA and SM evaluate extensions
- SM authorizes
What is required if HOURLY JSCALORH is > 100%
- Reduce power within 1 hour
- Monitor 10 min average until ≤ 100%
What is required if 12 hour average is > 100%?
- IMMEDIATELY reduce power
- CR
What is required if JSCALOR is not available?
- Use NKBDELTC
- Maintain power for 12 hours
- After 12 hours reduce to < 96.6%
How many set of rounds can be stored on the hand held?
- 500
- who cares
Who logs medical restrictions for licensed operators?
- U1 SM
What is the SM/ CRS responsible for logging?
- LCO entry/ exit/ required actions
- Unexpected alarms when cause not known
- Chemistry action levels
- Anything with SSC’s
- RMAL
- Injuries requiring off-site medical
- Mode changes
What is RO’s responsible for logging?
- Power changes > 10%
- Equipment status changes
- Significant equipment malfunction
- T-mod install/ removal
- ECC directives
- SESS manual inputs
Who is the “Final Authority” on protected equipment?
- SM
Who can grant access to protected equipment during an emergency?
- CRS
How long do you have to post protected equipment?
- Short Duration - Not required
- Emergent - 4 hours
- Planned activity - Prior to removal of equipment
Who performs shutdown safety function assesment?
- STA
What are the Shutdown Safety Funcitons?
- Rx control
- MVA
- RCS/ SFP inventory and Heat removal
- RCS press control
- CHR
- CI/ CTPC
What is considered working “near” protected equipment
- <2 feet
Who reviews IST/ ST’s of SAFETY RELATED pumps?
How long do they have?
- SM/CRS
- 96 hours from acceptance review completion
During an ST review what is the ACCEPTANCE REVIEWER checking?
- Technical and Administrative accuracy
- calculations
- Data in acceptance criteria
- log entries complete
- pre-conditioning
Who performs acceptance review of ST’s?
- Someone qualified to do the ST
How long do you have to perform PARTIAL PERFORMANCE REVIEWS?
- Shiftly/ Daily/ Weekly ST - N/A
- Monthly ST - 3 days from start
- > Monthly ST - 7 days from start
What is the review process for ABORTED ST’s
- Normal Review process
What is the required Oxygen concentration for confined spaces?
19.5 - 23.5%
What is the Lower flammability limit for confined spaces?
- < 10% LFL
Who is covered by fatigue management requirements at PVGS
- ANYONE performing covered work
- Operations
- Maintenance
- FTA
- Security
- RP/ Chemistry if ERO minimum
What is the MAX hours allowed to work in a 24 hour period?
- 16 hours
What is the MAX hours allowed to work in a 48 hour period?
- 26 hours
What is the MAX hours allowed to work in a 7 day period?
- 72 hours
What is the minimum break period for a 9-day period?
- 34 hours in 9 days
What is the OPERATIONS OUTAGE work limits
- 3 days off in each 15 day period
What is required if a fatigue waiver is granted?
- Face-to-face assessment
- within 4 hours
What conditions are required for a Clearance to not be required
- Isolations in workers line of sight
- Close enough workers can stop manipulation
- Minor servicing of equipment
Who can authorize deviation from Clearance Requirements?
what is required to do so?
- EC
- During an emergency
- Prevent hazard to personnel
- Prevent hazard to equipment
- Prevent release off-site
What requires double valve isolation?
- 200°F
- 500 psig
Who installs/ removes grounds for clearances?
- Electricians
How is a missing, unattached, or illegible tag resolved?
- CV
Can PVGS work be performed under an ECC clearance?
NO
Who authorizes resetting of tripped relays/ 86’s
- SM/ CRS
When can an 86 on class bus be reset from the CR?
- Bus supplied from DG
- Continued operation of load required
What initiates Contaminated Water Management?
- AOP
- EOP
Who performs Contaminated Water Management
How is that determined?
- Affected or unaffcted Unit SRO
- Affected unit SM/CRS determines who does it
When would the responsibility of Contaminated Water Management be transferred and to who?
- TSC is activated
- EC continues
What is performed to minimize Off-Site Release?
- Align sumps to LRS
- Iso. CD overboarding
- Start BAC
- Start all units Evaps
- Stop IX regens
How should the secondary plat be aligned during Contaminated Water Management?
- Long path recirc
- used until < release limts
When is a TSCCR created?
- Equip/ component impacting LCO is inoperable
When would a TSCCR not be required?
- Equipment OOS short period of time (before turnover)
When would a CR be initiated with a TSCCR?
- Equip/ Comp. failure
- Human Error
- Unkown cause