40AO-9ZZ18 Shutdown outside MCR Flashcards
1
Q
What PPS controls are there on each RSP?
A
- Low PZR press setpoint reset
- Low SG press setpoint reset
- MSIS acutation
2
Q
During 40AO-9ZZ18 Shutdown outside MCR, what are the initial actions PRIOR to leaving CR
A
- Trip Rx
- Stop 1 RCP in each loop (can be done from SWGR)
- Ensure MT tripped
If time permits:
- PLCS L/A @ 50%
- LD control and BP vlv switches in BOTH
3
Q
What are the major steps for performing a C/D with 40AO-9ZZ18 Shutdown outside MCR?
A
- Align CH to RWT (Borate)
- Feed with AF
- Trip MFP’s
- Control SG’s with ADV’s
- Initiate MSIS
- Perform C/D
- Done due to lack of control/ instrumentation for steam plant at RSP
4
Q
What C/D rate is established when cooling down with 40AO-9ZZ18 Shutdown outside MCR?
A
- 60°F/hr
5
Q
What is performed for MCR re-entry following 40AO-9ZZ18 Shutdown outside MCR
A
- 1 RO at RSP, 1 RO in CR
- Perform SPTA’s in CR
- Transfer ADV to CR
- Transfer AFA to CR
6
Q
What EAL classifications would be used for 40AO-9ZZ18 Shutdown outside MCR
A
Alert:
- CR evacuation
- Control of safety functions established in 15 minutes
SAE:
- CR evacuation
- Control of safety functions NOT established in 15 minutes
(15 minutes starts when CR evacuated/ CRS leaves)