How long do you have to classify EALs?
- 15 minutes
Who is the EC before ERO is activated?
- SM initially
- U1 SM multi-unit issue
- CRS if SM not available AND no plant transient
- CRS designee if SM not available and transient
Is an E-plan declaration required if it is discovered EAL was exceeded in the past?
- No
- NRC notification required within 1 hour
What information is required to be transmitted to offsite agencies within 15 minutes?
- Classifications
- PARs
- Rad Release status
- Event Termination
How long do you have to notify the NRC of E-plan events?
- 1 Hour
- ENS form and phone call
Who activates the Auto-Callout system?
- Security Director
Who, and at what level, is ERDS (Emergency Response Data System) acivated?
- STA
- Alert or Higher
- Within 1 hour
What is the minimum manning for ENS communicator?
STSC communicator?
- 1 ENS/ unit (normally filled by STA)
- 2 STSC for the site
What level is Assembly and Accountability required?
- Site Area Emergency or above
What is the time limit for reporting Accountability
- 30 minutes
What classification level is Evacuation required?
- Site Area Emergency or above
- EC may direct at NOUE/ Alert
Who do on-shift AOs take direction from?
- Main Control Room
What are the requirements for 2-Person Rule?
- Used in Security Event
- in Vital Areas
- Stay within line of site
- Do not need same qualifications
What are the characteristics of an Unusual Event?
- Potential Degradation safety of the plant
- Security Threat
- No Release off-site
What are the Characteristics of an Alert?
- Actual/ potential SUBSTANTIAL degradation plant safety
- Security Event w/ life threatening or damage
- Small Release
What are the characteristics of a Site Area Emergency?
- MAJOR failures of plant functions for safety
- Hostile Actions with damage
- Malicious Acts
- Release NOT exceed EPA limits at SITE BOUNDARY
What are the characteristics of a General Emergency?
- Imminent/ Actual substantial CORE DAMAGE or MELTING w/ Potential loss of CNTMT integrity
- Hostile Actions with loss of control of facility
- Release expected to exceed EPA limits OFF-SITE
When is ERO acitvated?
- Alert or Higher
What is the time limit for staffing ERO?
- 120 minutes if off-site
- 60 minutes during normal working hours
When are PARs made to the State?
- General Emergency
When would sheltering in place be directed?
- Short radiological release
- < 1 hour
- Evacuate as soon as impediments no longer exist
How long do you have to notify the State of PAR update?
- 15 minutes
How are PARs applied if wind direction cannot be determined?
- Apply to ALL sections
Who authorizes KI?
When would it be issues?
- EC
- Volunteers
- Exposure ***25 Rem to thyroid
What is the dose limit to protect property?
5-10 Rem
What is the dose limit to save lives?
- < 25 Rem non-volunteer
- > 25 Rem volunteers
What actions are NOT considered Hostile Actions against the site?
- Civil Disobedience
- Felonious acts NOT part of concerted attack
Who performs site accountability?
- Security Director