40AO-9ZZ16 RRS Malfunctions Flashcards

1
Q

For RRS Malfunctions (40AO-9ZZ16) what is the first mitigating step?

A

Ensure CEDMCS is NOT in AS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For an uncontrolled CEA withdrawal when is prompt and prudent action allowed?

A

Motion:
In - In the book, use AOP
Out - out of the book, Prompt and Prudent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

For RRS Malfunctions (40AO-9ZZ16), what condition could affect COLSS?

A

-If a failed instrument is failed, but still reading in normal range

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

During a Turbine Load Index (TLI) Failure what action should be taken if SBCS responds?
Why?

A
  • Remove SBCS from Remote-Auto

- changes to SBCS Master Controller signal when in 1E could cause perturbations in DFWCS, may result in a Rx trip.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the Upper and Lower limits for TLI(Tref)

A
  • 564°F

- 587°F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly