40AO-9ZZ10 Condenser Tube Rupture Flashcards

1
Q

How is Condenser Tube Rupture Defined?

A
  • CW leak through condenser > 1 gpm
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the Entry conditions for 40AO-9ZZ10 Condenser Tube Rupture

A

Condition 1:

  • Hotwell Na > 1.5 ppm
  • Hotwell Cond > 30 umho/cm

Condition 2:

  • SG Na is or expected > 0.1 ppm
  • SG Cond is or expected > 2 umho/cm
  • Chemistry parameters indicate so

Condition 3:
- Tube leak exists and management says so to make repairs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the major mitigating steps for 40AO-9ZZ10 Condenser Tube Rupture?

A
  • Chemistry sample determine affected half
  • Close/ Isolate Hotwell Drawoff
  • Close CW X-Tie
  • Align BFT vent to Condenser
  • Place HDT’s in L/A
  • Put demins in svc with 195 CLOSED
  • Reduce power to 40%
  • 60% stop 1 CW pump
  • 40% isolate ruptured train
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

During 40AO-9ZZ10 Condenser Tube Rupture what are the required number of demin vessels?

A

30/ 20/ 20/ 30:

  • 100-70% - 5
  • 70 - 50% or both MFP’s - 4
  • 50 - 30% 1 MFP running - 3
  • < 30% - 2
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

During 40AO-9ZZ10 Condenser Tube Rupture, what is the down power target and why?

A
  • 40%

- Able to isolate CW train

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

During 40AO-9ZZ10 Condenser Tube Rupture, at what power do you stop the First CW pump in the affected loop

A
  • 60%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During 40AO-9ZZ10 Condenser Tube Rupture and a plant shutdown is desired, when do you trip the Rx?

A
  • < 20%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

During 40AO-9ZZ10 Condenser Tube Rupture, what is Rx Trip Criteria?

A
  • 1 train of CW in svc and its ruptured
  • SG Na, Sulfates, Cl-, ≥ 1.0 ppm with ↑ cation cond
  • SG Cond ≥ 15 umho/cm with ↑ Na, Sulf, Cl
  • Hotwell Na > 35 ppm
  • Minimum demins not available and CRS says so
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During 40AO-9ZZ10 Condenser Tube Rupture, What indicates that CW level has drained below the ruptured tube while draining?

A
  • Increase in AR pump off gas flow
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During 40AO-9ZZ10 Condenser Tube Rupture, what level do you maintain the unaffected hotwell half and why?

A
  • ≥ 41”

- Full suction from 1 half causes ≈ 10” drop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly