40AO-9ZZ03 Loss of Cooling Water Flashcards
1
Q
When does the PW pump Auto start
A
- 40 psig discharge pressure
2
Q
What is required if PW is NOT restored
A
Trip the Reactor
3
Q
What is required if TC is NOT restored
A
Trip the Reactor
4
Q
How do we minimize loads on TC
A
- Stop SGBD
- Align AFW
- Trip both MFP’s
- Stop HDP’s
- Stop CD pumps (MFP’s not running)
- Stop Service air compressor/ IA compressor
- Use SBCV’s 1007/8
- Break vacuum when MT<1200 rpm
- Stop CW pumps
- Stop EHC
5
Q
How long do we have to restore NC flow to RCP’s
A
- 3 minutes without seal injection
- 10 minutes with seal injection
6
Q
What is required if unable to restore cooling to RCP’s
A
- Trip the Rx
- Stop all RCP’s
- Isolate Seal Bleedoff
7
Q
What are the actions for a NC leak inside containment
A
- Close NC CIV’s BEFORE TRIP
- Trip the Rx
- Stop RCP’s
- Isolate Bleedoff
8
Q
When cross connecting EW to NC how far do you throttle SDC HX outlet vlv
A
- RCP low NC flow alarm clears (>450 gpm)
- EW system flow <8500 gpm
9
Q
What is the TCA for a loss of cooling to a RCP
A
30 Minutes
- Reduce power or isolate cooling water and shutdown RCP
- FSAR time requirement