40AO-9ZZ08 Load Rejection Flashcards
For 40AO-9ZZ08 Load Rejection, what are the exit conditions for Main Turbine trip?
Condition 1:
- Power ≈ 20% and decided to S/D
Condition 2 & 3:
- Either decide to Restore Turbine OR maintain conditions
- Power 7-12%
- CEA’s support restore turbine OR maintaining conditions
- ZZ04 Mode 2 to Mode 1 entered
Condition 4:
- Power stabile 7-12% decide to S/D
For 40AO-9ZZ08 Load Rejection, what are the exit conditions for Partial Load Rejection?
Condition 1:
- Cannot overcome Xe OR decide to reduce power
- Time limits for power reduction determined
- ZZ05 entered for power reduction
Condition 2:
- Power stabile and decide to raise power
- CEA’s > TIL
- ZZ05 entered to raise power
Condition 3:
- Power stabile and decide to maintain
- CEA’s > TIL
- ZZ05 entered
For 40AO-9ZZ08 Load Rejection, what is Rx Trip Criteria for Turbine Trip?
- Power was ≥ 74% and RPCB fails auto/man
- CEA deviates from subgroup > 6.6” and any CEA reg group < TIL
- SGWL trips challenged
- RG 3 < 60” withdrawn
- Power > 12% and SBCS interlock in and can’t reset
- CPC ASI (pt 187) > ±0.45 trending 0.5
- Unit S/D desired for repairs
For 40AO-9ZZ08 Load Rejection, what is Rx Trip Criteria for Partial Load Rejection?
- Generator cannot be stabilized AND RPCB not in svc (trip turbine if RPCB in svc)
- CEA deviates from subgroup > 6.6” and any reg group < TIL
- RG 3 < 60” withdrawn
- SGWL trips challenged
- CPC ASI (pt 187) > ±0.45 trending to 0.5
- < 410 MW and vacuum > 5”HgA or > 4”HgA for 1 hour
What are the consequences of manually actuating RPCB LOFP during a LLR?
- SBCS receives Quick Open Block
- Rx Trips on High PZR Press
During 40AO-9ZZ08 Load Rejection following a Turbine Trip at what power do you stabilize and why?
12%
- CPC use canned ASI value
- ↓Condenser erosion
- DCCV swapover
- FWCS 1E control
- LCO for Tilt and ASI not applicable <20%
During 40AO-9ZZ08 Load Rejection following a turbine trip, is the time goal for reducing power
Reduce power to ≈ 12% in
90 MINUTES
Following 40AO-9ZZ08 Load Rejection, how is CEA overlap restored?
If RG 3 withdrawn > 95”
- Withdraw RG 4 to RG3-95”
- 10” pulls
- Waiting 1 minute between pulls
When down powering following RPCB Load Rejection, at what power do you stop borating?
- 17%
- Stabilize 10-12% via CEA/dilution