40AO-9ZZ08 Load Rejection Flashcards

1
Q

For 40AO-9ZZ08 Load Rejection, what are the exit conditions for Main Turbine trip?

A

Condition 1:
- Power ≈ 20% and decided to S/D

Condition 2 & 3:

  • Either decide to Restore Turbine OR maintain conditions
  • Power 7-12%
  • CEA’s support restore turbine OR maintaining conditions
  • ZZ04 Mode 2 to Mode 1 entered

Condition 4:
- Power stabile 7-12% decide to S/D

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For 40AO-9ZZ08 Load Rejection, what are the exit conditions for Partial Load Rejection?

A

Condition 1:

  • Cannot overcome Xe OR decide to reduce power
  • Time limits for power reduction determined
  • ZZ05 entered for power reduction

Condition 2:

  • Power stabile and decide to raise power
  • CEA’s > TIL
  • ZZ05 entered to raise power

Condition 3:

  • Power stabile and decide to maintain
  • CEA’s > TIL
  • ZZ05 entered
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

For 40AO-9ZZ08 Load Rejection, what is Rx Trip Criteria for Turbine Trip?

A
  • Power was ≥ 74% and RPCB fails auto/man
  • CEA deviates from subgroup > 6.6” and any CEA reg group < TIL
  • SGWL trips challenged
  • RG 3 < 60” withdrawn
  • Power > 12% and SBCS interlock in and can’t reset
  • CPC ASI (pt 187) > ±0.45 trending 0.5
  • Unit S/D desired for repairs
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

For 40AO-9ZZ08 Load Rejection, what is Rx Trip Criteria for Partial Load Rejection?

A
  • Generator cannot be stabilized AND RPCB not in svc (trip turbine if RPCB in svc)
  • CEA deviates from subgroup > 6.6” and any reg group < TIL
  • RG 3 < 60” withdrawn
  • SGWL trips challenged
  • CPC ASI (pt 187) > ±0.45 trending to 0.5
  • < 410 MW and vacuum > 5”HgA or > 4”HgA for 1 hour
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the consequences of manually actuating RPCB LOFP during a LLR?

A
  • SBCS receives Quick Open Block

- Rx Trips on High PZR Press

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

During 40AO-9ZZ08 Load Rejection following a Turbine Trip at what power do you stabilize and why?

A

12%

  • CPC use canned ASI value
  • ↓Condenser erosion
  • DCCV swapover
  • FWCS 1E control
  • LCO for Tilt and ASI not applicable <20%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During 40AO-9ZZ08 Load Rejection following a turbine trip, is the time goal for reducing power

A

Reduce power to ≈ 12% in

90 MINUTES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Following 40AO-9ZZ08 Load Rejection, how is CEA overlap restored?

A

If RG 3 withdrawn > 95”

  • Withdraw RG 4 to RG3-95”
  • 10” pulls
  • Waiting 1 minute between pulls
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When down powering following RPCB Load Rejection, at what power do you stop borating?

A
  • 17%

- Stabilize 10-12% via CEA/dilution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly