40AO-9ZZ11 CEA Malfunction Flashcards

1
Q

What are CEA Malfunction trip criteria

A
  • Uncontrolled CEA movement (continues after out of AS)
  • 1 CEA deviates >6.6” and reg group below TIL
  • 2 or more CEA >9.9” deviation
  • CPC ASI ± 0.45 trending to 0.5
  • 12 finger CEA misaligned and cant be restored before DNBR/LPD trips
  • CEA deviation prior to criticality (2 or more CEA >9.9”)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the required power reductions for CEA slip/drop

A
  • > 80% 20% Down power
  • 70-80% 15% Down power
  • 45-70% 10% Down power
  • 35-45% 5% Down power
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How long do you have to START a down power on a slipped/drop CEA

A

10 Minutes

- 15 per FSAR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How long do you have to COMPLETE a down power for a slipped/drop CEA

A

1 Hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How is the initial down power for a slipped/drop CEA accomplished

A
  • Lower Turbine load
  • Maintain Tavg>Tref 3-3.5*F

PZR Lvl LCO May be entered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the required boration rate for a slipped/drop CEA down power

A

35 gpm or greater

STA worksheet, borate at 40gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What procedures are you allowed to use to align for boration on a slipped/drop CEA down power

A
  • AOP

- Emergency Boration AOP?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long do you have to realign CEA’s following a slip/drop

A

2 Hours

  • If not met commence shutdown
  • LCO 3.1.5. C Mode 3 in 6 hours
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How do CPC’s react to a 12 finger CEA misalignment

A
  • affected quadrant CPC trip
  • CEAC PF builds in other channels
  • PF builds in over 6 hours
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How does COLSS react to a slipped NOT dropped CEA

A
  • Rod bottom contact not actuated Pulse counter not reset CEA position unkown
  • CEA position used for DNBR/LPD POL’s now bad
  • ASI/Tilt used incore still good

-COLSS is NOT out of service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How does a CEA slip >7.5” (without resetting pulse counter) affect LHR and DNBR LCO’s

A
  • LCO’s not met
  • Enter condition A
  • Restore in 1 Hour
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What actions are required if COLSS is OOS

A
  • 72ST-9RX03 DNBR/LHR/ AZTILT/ASI
  • LHR/ DNBR adverse trend assumed LCO not met enter Condition B
  • Determine Trend Every 15 minutes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Are you allowed to Prompt and Prudent place CEDMCS in STBY for CEA motion

A
  • Inward motion NO

- Outward motion YES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How are misaligned CEA’s recovered?

A
  • Place CEDMCS in MI
  • Align affected CEA’s to group
  • Maintain Tavg/ref <3*F
  • MAX 2 step difference between all affected CEA’s
How well did you know this?
1
Not at all
2
3
4
5
Perfectly