What are the entry conditions for Degraded Electrical Power (40AO-9ZZ12)?
- Loss of any bus ≥ 480v no LOOP or SBO
- Loss of any bus ≥ 480v no LOOP or SBO and power restoration desired DURING EOP’s
- Any board dark after EOP’s
During Loss of any bus ≥ 480v no LOOP or SBO when would you bypass all parameters on a PPS channel?
- Loss of PBA/B
- 90 minutes elapsed
- parameter NOT bypassed on other channels
During Loss of any bus ≥ 480v no LOOP or SBO and LOP (PB) and DG breaker fails to automatically close occurred what actions are taken?
Where are these actions found?
Ensure:
- Frequency 59.9 - 60.5Hz
- Voltage 4180 - 4300 V
- Norm/ Alt Brkr OPEN and no faults
- Check DG LO relay not actuated
- Manually close DG brkr
- If unable to energize bus Emergency Stop DG
SPTA’s - Hard Card
AOP - AOP guidance
How do Foxboro controllers FAIL?
How do the respond when restored?
- Fails with 0 output
- Restores to MAN with 0 output
What MCC supports the SBOG’s and what is its power source?
- M56
- NAN-S06 Norm
- NAN-S05 Alt
What are the ratings of the SBOG’s and what affects their max loading?
- 3400 kw at 122°F
- Affected by ambient temperature
- Cable limits to 6000 kw
When would you perform 40ST-9ZZ37 inoperable power sources?
Loss of:
- NAN-S03
- NAN-S04
- NAN-S05
- NAN-S06
- PBA
- PBB
What is the concern when restoring power to NAN-S01 and why?
- Trips ANY running MFP
Loss of power to:
- NQN-D02
- LON-C01
- LON-C02
- I&C support needed
While restoring power, when would you coordinate with the ECC?
- S/U XFMRS
While restoring power, when would you coordinate with RW
- L05
- L16
While restoring power, when would you coordinate with WRF?
- U1 NAN-S05
- U1 NAN-S06