During 40AO-9ZZ20 Loss of HVAC, what are the major mitigating steps for Loss of Normal Chillers

A
  • Attempt to restart Chillers
  • Maintain WC < 50°F
  • If unable to maintain < 50° CLOSE WCN-70 Radwaste and Control bldg isolation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

During a loss of CEDMCS room cooling, what temperature would require a shutdown and why?

A
  • > 104°F

- SCR breakdown may cause slipped/ dropped CEA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If cooling is lost to CEDMCS room, what actions are required?

A
  • Limit CEA motion to only ASI control
  • establish temporary ventillation
  • Shutdown if > 104°F
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What may occur if CEDMCS cabinet fans are lost?

What actions are taken to mitigate?

A
  • Spurious CEA malfunctions
  • Limit CEA motion to ASI control
  • CEDMCS not in AS
  • Open cabinet doors
  • Temporary ventillation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When will CEDM coil damage occur if CTMT CEDM cooling is lost?

A
  • RCS ≥ 300°F

- 40 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

If CNTMT CEDM cooling is lost how long do you have to restore cooling?
What is required if cooling cannot be restored?

A
  • Restore in 10 minutes OR start rapid shutdown
  • Secure S/D if restored in 40 minutes
  • Trip Rx before 40 minutes
  • Cooldown to < 300 in 4 hours
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During a loss of cooling to AF pump rooms:
When is temporary ventilation required?
What is the analyzed temperature?
What is the qualified temperature?

A
  • 101°F temporary ventilation
  • < 104°F analyzed**
  • 150°F AFA qualified
  • 156°F AFB qualified
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

During a loss of CH pump room cooler, How long can CH pumps run without cooling?
when would you consider stopping a CH pump?

A
  • 100 hours

- > 120°F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If Control Building HVAC is lost, when would you de-energize BOP-ESFAS and why?

A
  • > 119°F in MCR
  • simultaneous failure of BOTH load sequencers
  • Causes continuous load shed
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If Control Building HVAC is lost, when would you be required to down power PMS?

A
  • > 80°F in computer room
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the CR air temperature limit?

A
  • 80°F

- Restore in 30 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the concern with a loss of ESF Equipment Room Essential HVAC?

A
  • 1 Fan cools 2 inverters
  • LCO 3.8.7 entry and restore in 1 hour

(LCO may be exited with temporary ventilation)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
What is the most limiting analyzed acceptable temperature limit for DC equipment, battery rooms and class
switchgear?
A
  • 120°F

- 30 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the electrical penetration room temperature limit?

A
  • 101°F

- LCO entry and temporary ventilation required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the most limiting analyzed acceptable temperature limit for electrical pen rooms?

A
  • 122°F

- 30 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

During a loss of Main Generator Collector housing cooling, what is the temperature limit for collector brushes?

A
  • 100°C
17
Q

What is required if temporary blowers are used for venitilation?