Building Component Safety Information Flashcards
A. Installation checklist for installing trusses
1. Upon delivery check for:
a.
b.
- Upon delivery check for:
a. Missing or damaged connector plates
b. Damaged wood members
Do not do what without the manufacturers guidelines or specifications?
Do not cut, drill, relocate or repair trusses without the manufacturers guidelines or specifications.
Protect trusses from
weather, corrosion, bending and damage.
A. Installation checklist for installing trusses
Examine structural
Examine structural framing bearing points
Review number of X and Y for girder trusses
plies and nailing patterns
Space trusses to within + or - X
Space trusses to within + or - 1/4”
When do you install structural sheathing to plumbed trusses.
as soon as possible
B. Unloading and Lifting Trusses
what do you avoid?
Avoid lateral bending
B. Unloading and Lifting Trusses
When do you remove banding materials
When you are ready for install
B. Unloading and Lifting Trusses
upright truss bundles should be
braced
B. Unloading and Lifting Trusses
Do not lift by .
truss bands or webs
Do not store on uneven ground. Horizontally stored trusses are to have blocking spaced at X. to Y. intervals. Trusses stored longer than a Z time period need to be protected from weather but
still provide ventilation.
8ft to 10 ft
1 week
On trusses longer than x feet, use an engineering spreader bar
30 feet
Diagonal cross bracing must be installed every X feet
20 feet
Use at least X, Y, and Z nails in each truss for lateral restraint and diagonal bracing. ( Check nail schedule)
Nails must be flush.
Use at least 2-10d, 2-12d, or 2-16d nails