TB 126 METRO GOLD LINE EASTSIDE EXTENSION CONSTRUCTION PHASE Flashcards

1
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

A 4” water supply system provides cooling for the TBM and water for firefighting operations. This system is equipped with 2-1/2” NST outlets every 200 feet within the tunnel and a Fire Department connection located above ground next to the hydrant at Bailey Street and Pennsylvania Avenue (southwest corner).

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Excavation of earth is accomplished with a Tunnel Boring Machine (TBM), which is approximately 300 feet long and can tunnel up to 100 feet a day.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

There is a 13,000-volt AC supply in. the tunnel that is transformed down to 480 volts.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

If the atmosphere in the tunnel is compromised, entry will be limited to US&R certified members wearing re-breathers.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

The On-Site Safety Plan advocates that injured victims are to be brought to the portal and crane-lifted on a Stokes Litter Basket by Construction Workers to grade level. Fire Department resources should coordinate operations with the “Crane Operator who will facilitate moving the victim and/or provide current situation status. Consideration should be given to assigning a member with the operator to,rnaintain positive communications.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

First responders, in order to facilitate a rescue, may utilize on-site monitoring experts to determine atmospheric safety levels, as long as work in the affected area is deemed safe for tunnel construction workers.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

All Fire personnel may enter a tunnel with a non-compromised atmosphere (oxygen levels between 19.5-23%, CO levels no greater than 25 ppm, H2S no greater than 10 ppm, N02 no greater than 5 ppm, C02 levels no greater than 5%, LEL no greater than 10%), provided they wear a SCBA and a Self-Rescuer respirator. First responders may obtain tunnel atmospheric information from the Traylor Brothers Safety Officer, a Traylor Brothers Supervisor, an MTA Inspector, or from the gas indicators located in the onsite construction trailer.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

These allowable atmospheric readings will be posted in the contractor’s trailer immediately adjacent to the gas indicators. It should be noted that if a Department issued 3-gas monitor registers an alarm, the area should be considered a compromised atmosphere, as the monitor is pre-set for allowable oxygen levels, CO levels, and LEL.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Self-Rescuer respirators are maintained and stored at each portal entry by the contractor for the specific use of LAFD personnel.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Compromised Atmosphere:

Entry into a known compromised atmosphere (any reading other than the approved NIOSH levels-
see non-compromised atmosphere) makes the breathing apparatus policy more restrictive. A SCBA and a Self-Rescuer respirator is required, however personnel are limited to initial observation or atmospheric testing with the following conditions:

  1. A two-member” team that is in sight of the surface (in the vertical shaft).
  2. A four-member team if they will be out of sight of the vertical shaft.
  3. A back-up team is standing by.
  4. Entry into a compromised atmosphere does not exceed a distance of 500’. Members entering a compromised atmosphere under the above conditions are limited to 12 minutes working time with a 60-minute bottle and 9 minutes with a 45-minute bottle, thereby allowing sufficient air reserve to exit the tunnel.

Entry into a tunnel with a known compromised atmosphere beyond initial observation or atmospheric testing is limited to US&R certified members only.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

The Tunnel Utility is assigned to Fire Station 25. The Tunnel Utility is a Department Van with 18 complete Bio-Marine brand “Biopak 240” re-breathers, Cyalumne glow sticks and other pertinent tools and equipment to support the use of the re-breathers.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

direct fire attack should only be justified if there is a possibility of saving a life. In the event of a fire, companies will have a water supply via the four-inch contractor’s water supply pipe.

The water system in the tunnel, during construction, consists of a:

  • 4-inch temporary pipe supplied by a hydrant
  • 2%” Fire Department outlet every 200’
  • Fire Department connection located next to the hydrant at ground level.

Engineers shall pump a max. of 150 psi into the Fire Department connections.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

If the tunnelatmosphere is determined to be non-compromised, the first-in company may enter the tunnel to assist with patient care as long as they comply with the SCBA and self-rescue device requirements.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Staging reports to Operations and will operate above ground in close proximity to the Portal opening.

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Tunnel Division will ensure that all emergency operations are discontinued and the tunnel evacuated should the tunnel atmosphere meet or exceed 20% Lower Explosive Limit (LEL).

A

reference

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Entry Teams shall be comprised of certified US&R personnel.

Ensuring that the entry teams are comprised of an even number of personnel (buddy system), usuany six but never less than four members.

A

reference

17
Q

TB 126 METRO GOLD LINE CONSTRUCTION PHASE”

Communications-There are three intrinsically safe methods of electronic communications within the tunnel. Contractor hardwire communication system– Every 1000 feet within the tunnel there is a telephone headset that is designed to maintain communication within the tunnel and above grade.

US&R companies carry an entire “confined-space” hardwire communication system with well over 1,000 feet of wire for communication within the tunnel.

radio communication will be line-of-site, in the “direct mode,” which may require relaying information to the Incident Commander.

No other devices are to be used below grade, including cell phones, as they are not intrinsically safe.

A